The pressure-sandwich arrangement exhausts the fire floor and supplies air to surrounding floors. Other layouts can pressurise all unaffected zones or only adjacent ones; the NFPA handbook explains that the zone geometry follows the building's barriers and functional arrangement. It need not always coincide with one complete storey.<ref name="NFPA-§18.3,pp.18-51-18-52" /><ref name="Klote-4-289–4-290" /> | The pressure-sandwich arrangement exhausts the fire floor and supplies air to surrounding floors. Other layouts can pressurise all unaffected zones or only adjacent ones; the NFPA handbook explains that the zone geometry follows the building's barriers and functional arrangement. It need not always coincide with one complete storey.<ref name="NFPA-§18.3,pp.18-51-18-52" /><ref name="Klote-4-289–4-290" /> | ||
[[File:fse-zoned-smoke-control-v1.svg|thumb|upright=1.5|alt=Zoned smoke control: selecting zones and identifying the fire location, showing the relationships described in the text.|Selecting zones and identifying the fire location in the assessment of Zoned smoke control.]] | |||
A [[Smoke damper|smoke damper]] helps establish the selected airflow paths. The supply and return system may need to isolate some routes while keeping others available. [[HVAC system fire protection]] consequently depends on compatible ventilation and smoke-control zones. A control drawing with different zone boundaries from the actual partitions cannot establish the intended pressure arrangement.<ref name="NFPA-§18.3,p.18-52" /><ref name="NFPA-§10.4,pp.10-72-10-74">Cote et al. (2008), §10.4, pp. 10-72–10-74.</ref> | A [[Smoke damper|smoke damper]] helps establish the selected airflow paths. The supply and return system may need to isolate some routes while keeping others available. [[HVAC system fire protection]] consequently depends on compatible ventilation and smoke-control zones. A control drawing with different zone boundaries from the actual partitions cannot establish the intended pressure arrangement.<ref name="NFPA-§18.3,p.18-52" /><ref name="NFPA-§10.4,pp.10-72-10-74">Cote et al. (2008), §10.4, pp. 10-72–10-74.</ref> | ||
| Line 26: | Line 27: | ||
Pressure drives airflow through gaps in a boundary. Klote describes the flow using an effective leakage area and a coefficient representing the opening geometry. For most paths other than extremely narrow cracks, a square-root pressure relationship is a useful approximation. The required fan flow consequently depends on the openings as well as the selected pressure difference.<ref name="Klote-4-280–4-282">Klote (2002), pp. 4-280–4-282.</ref> | Pressure drives airflow through gaps in a boundary. Klote describes the flow using an effective leakage area and a coefficient representing the opening geometry. For most paths other than extremely narrow cracks, a square-root pressure relationship is a useful approximation. The required fan flow consequently depends on the openings as well as the selected pressure difference.<ref name="Klote-4-280–4-282">Klote (2002), pp. 4-280–4-282.</ref> | ||
[[File:fse-zoned-smoke-control-v2.svg|thumb|upright=1.5|alt=Zoned smoke control: leakage, pressure and a worked airflow example, showing the relationships described in the text.|Leakage, pressure and a worked airflow example in the assessment of Zoned smoke control.]] | |||
<math display="block">\dot V=C A\sqrt{\frac{2\Delta P}{\rho}}</math> | <math display="block">\dot V=C A\sqrt{\frac{2\Delta P}{\rho}}</math> | ||
| Line 100: | Line 102: | ||
Atria connect spaces that might otherwise be separated into smaller compartments. Without suitable barriers, smoke can spread through the shared volume and reach communicating areas; Milke identifies this as a different problem from smoke control in a well-compartmented building. Pressure differences across barriers cannot perform the same function where the required physical separation is absent.<ref name="atriumsmokec_Milke-292">Milke (2002), pp. 4-292–4-294.</ref> | Atria connect spaces that might otherwise be separated into smaller compartments. Without suitable barriers, smoke can spread through the shared volume and reach communicating areas; Milke identifies this as a different problem from smoke control in a well-compartmented building. Pressure differences across barriers cannot perform the same function where the required physical separation is absent.<ref name="atriumsmokec_Milke-292">Milke (2002), pp. 4-292–4-294.</ref> | ||
[[File:fse-zoned-smoke-control-v3.svg|thumb|upright=1.5|alt=Zoned smoke control: what the system is intended to protect, showing the relationships described in the text.|What the system is intended to protect in the assessment of Zoned smoke control.]] | |||
The large volume can initially moderate the hazard. Air mixed into the plume reduces the concentration of combustion products and lowers the smoke temperature; however, dilution also increases the quantity of gas delivered to the layer. A benefit in concentration therefore accompanies an increased smoke-handling demand.<ref name="atriumsmokec_Milke-293">Milke (2002), pp. 4-292–4-293.</ref> | The large volume can initially moderate the hazard. Air mixed into the plume reduces the concentration of combustion products and lowers the smoke temperature; however, dilution also increases the quantity of gas delivered to the layer. A benefit in concentration therefore accompanies an increased smoke-handling demand.<ref name="atriumsmokec_Milke-293">Milke (2002), pp. 4-292–4-293.</ref> | ||
Revision as of 09:13, 13 November 2026
Zoned smoke control is a method that uses pressure differences and controlled airflows to restrict smoke to a selected part of a building. The building is divided into zones bounded by walls and floors. Fans then create a lower-pressure fire zone and appropriate pressure relationships with adjoining spaces.[1][2]
A zone may occupy part of a floor, a whole floor or several floors. Its boundaries must agree with the physical barriers, the ventilation arrangement and the initiating devices. Accurate identification of the fire zone is essential to the intended sequence. Pressurising the wrong zone can encourage smoke movement into areas intended to remain protected.[3]
The method belongs to the broader subject of smoke control and is discussed with stair pressurisation in the National Fire Protection Association (NFPA) handbook's account of NFPA 92 guidance. It relies on the interaction between the enclosure and the mechanical system. Leakage, door opening and other forces driving smoke movement remain part of the assessment.[4][5]
Selecting zones and identifying the fire location
The pressure-sandwich arrangement exhausts the fire floor and supplies air to surrounding floors. Other layouts can pressurise all unaffected zones or only adjacent ones; the NFPA handbook explains that the zone geometry follows the building's barriers and functional arrangement. It need not always coincide with one complete storey.[2][1]
A smoke damper helps establish the selected airflow paths. The supply and return system may need to isolate some routes while keeping others available. HVAC system fire protection consequently depends on compatible ventilation and smoke-control zones. A control drawing with different zone boundaries from the actual partitions cannot establish the intended pressure arrangement.[3][6]
The initiating signal must identify the relevant fire zone; the NFPA handbook gives the example of a person operating a manual alarm after leaving that zone. Treating that alarm location as the fire location could select the wrong pressure sequence. Detection zoning and control logic therefore form part of the smoke-control design.[3]
Underground and windowless structures illustrate an application where natural smoke release may be limited and escape paths can be indirect. Their design still depends on their actual connections and required protection strategy. The presence of mechanical exhaust alone does not establish zoned containment. Barriers, replacement air and the route to the outside remain necessary parts of the defined system.[7][8]
Exhausting the fire zone is not the same as guaranteeing breathable conditions within it. Klote distinguishes control of spread from dilution in the room where smoke is being generated; the continuing fire can produce smoke faster than ordinary ventilation removes it. The protection objective therefore identifies which spaces are intended to remain usable.[9]
Opening a boundary creates another operating condition. Occupants can pass through doors while the pressure system runs, and those openings may dominate the leakage. A design based only on closed doors does not describe that interval. The selected scenarios identify relevant open-door combinations and the resulting flows.[5]
A network calculation represents rooms and shafts as connected spaces with pressure and temperature conditions. Connections represent doors, construction leakage and other air paths. Klote describes solving the combined network to include wind, temperature differences and fan operation. This makes the relationship between zones explicit, rather than treating each fan as an isolated system.[10]
The computed result still depends on the specified openings and equipment states. An inaccurate leakage estimate can change the pressure available at a boundary. Acceptance testing therefore examines the completed system in its required modes. Comparing those measurements with the design assumptions helps identify whether the intended pressure arrangement was actually established.[10] Those measurements record actual pressure differences across the relevant zone boundaries.[10]
Leakage, pressure and a worked airflow example
Pressure drives airflow through gaps in a boundary. Klote describes the flow using an effective leakage area and a coefficient representing the opening geometry. For most paths other than extremely narrow cracks, a square-root pressure relationship is a useful approximation. The required fan flow consequently depends on the openings as well as the selected pressure difference.[11]
| Symbol | Description | Unit |
|---|---|---|
| Volume flow through the opening | m³/s | |
| Flow coefficient | Dimensionless | |
| Effective leakage area | m² | |
| Pressure difference across the opening | Pa | |
| Density of the entering air | kg/m³ |
Klote's example uses a leakage area of 0.01 m². With a flow coefficient of 0.65 and air density of 1.2 kg/m³, a pressure difference of 2.5 Pa gives approximately 0.013 m³/s. Increasing the pressure difference to 75 Pa gives approximately 0.073 m³/s; these are calculations for the stated closed-door leakage, not for an open doorway.[12]
An opened door changes the flow area substantially. Pressure differences elsewhere can then fall, even while the fan continues to run. Open-door control is consequently assessed in terms of the appropriate airflow, whereas closed-door performance is commonly assessed through pressure differences. The operating state belongs with every calculation and measurement.[5]
Increasing pressure has a competing effect on door operation. The pressure difference adds force at the door leaf, and the closer contributes another force. A system that restricts smoke but makes an escape door difficult to operate has not resolved the combined problem. Leakage, airflow and door forces therefore remain linked design conditions.[13]
Control interfaces and acceptance evidence
The complete control sequence requires an operational check as well as a component inspection. The NFPA handbook describes interfaces between fire alarms and building ventilation systems, often installed by different trades. Correctly operating individual components does not establish that their combined sequence is correct; the initiating signal, damper positions and fan operation must describe the same intended fire condition.[14]
The Australian Building Codes Board's 2020 data sheets distinguish installation checks from tests of system performance in its required operating modes; they describe defect correction followed by retesting. These activities connect the design assumptions to the installed arrangement. A completed drawing or equipment label cannot supply the results of those operational tests.[15]
Changes to a building can alter both its leakage and its controls. New partitions change flow paths, while altered ventilation zones can change which spaces receive or lose air. Continued inspection and maintenance therefore concern the system configuration as well as the condition of each device. Access for checking dampers and other equipment supports that continuing assessment.[15]
Dependence on another protection system also belongs in the assessment. Where the smoke design assumes that sprinklers limit the fire, failure of suppression can increase smoke production and thermal exposure. The data sheets identify this as a linked failure condition; the two systems cannot be assigned independent successful outcomes when one depends on the other's performance.[16]
Smoke separation and pressure differences
Restricting fire spread and restricting smoke movement are related but distinct functions. Smoke can pass through cracks and leakage paths while a boundary remains intact. Klote identifies gaps around doors, pipe penetrations and wall-to-floor junctions as examples. The pressure difference across the boundary determines the driving force for that leakage.[17]
Several forces can create the pressure difference. Klote discusses buoyancy from heating, stack effect, wind and mechanical ventilation, and these can act together, so smoke movement is not determined by temperature alone. Stopping ventilation fans removes one influence but does not eliminate movement driven by the others.[18][19]
Mechanical smoke control can use pressure differences across closed boundaries and airflow through open doorways. The appropriate assessment changes when a door opens; a pressure difference across a mostly closed barrier is not equivalent to the airflow required through a large opening. Klote therefore distinguishes closed-door and open-door conditions.[20]
C/VM2, second edition of 2025, likewise distinguishes fire separations, smoke separations and unrated construction within the trial design. The method applies different assumptions to their continued presence during a fire. Those assumptions describe the analysis framework and the evidence attributed to each separation; they are not predictions that every physical partition disappears at one identical temperature.[21]
Closure and airflow conditions
The NUREG-1805 glossary describes assemblies of blades or louvers released by a fusible link or a remote activation signal. A fusible link responds to heat by melting and allowing closure, and a remote signal provides another means of initiating the movement. These are alternative arrangements in the source, rather than a description of every product.[22]
The conditions during closure matter as well as the closed-state fire performance. Iqbal and Salley distinguish a fire-resistance rating from an airflow-closure rating, and the latter depends on whether the ventilation system is stopped when fire is detected. The design therefore needs to connect the assumed fan state to the damper's closing duty.[22]
A static closure arrangement is associated with stopped airflow. A dynamic arrangement is intended to close under the relevant airflow conditions; these labels concern the operating condition against which closure is assessed. They do not, by themselves, describe smoke leakage, the surrounding wall or every subsequent control action.[22]
Stopping a fan also does not remove every force moving gases through a building. Klote identifies stack effect, buoyancy and wind as additional drivers; these can continue moving smoke through ventilation passages even after mechanical supply stops. The intended closure function therefore remains distinct from the instruction to switch off a fan.[23][24]
Installation and operational dependencies
The installed arrangement joins building construction and ventilation control. Its assumed conditions include the protected boundary, the air passage and the state of the ventilation system during fire. The damper's closure duty must correspond to that operating state; otherwise, the design would rely on a function different from the one described by the selected evidence.[22][25]
The opening can be affected by changes elsewhere in the system. Klote explains that fan operation and other pressure drivers influence smoke movement. A revised ventilation arrangement can therefore change the physical conditions at the closure. This relationship follows from the system behaviour, even where the wall and damper remain in the same positions.[23][26]
The penetration treatment also depends on its construction context. C/VM2's orientation requirement distinguishes a seal's intended application from its material identity. The same principle prevents a general description of a sealing material from establishing every installed crossing. The evidence concerns the arrangement in which the material performs its protective function.[25][27]
Inspection and changes to the building
The 2005 International Fire Engineering Guidelines distinguish static barriers from operable protective features. Construction checks establish whether components match the specification and whether operable systems work as intended. Operational testing addresses a different question from visual continuity of a wall. Both observations are relevant where a boundary includes a moving closure.[28]
Repairs and modifications can overlook the role of passive fire-separating construction. The guidelines therefore emphasise continued identification of boundaries and preservation of their integrity. For a duct crossing, that includes retaining the connection between the opening protection and the surrounding separation. A local change can otherwise affect a boundary whose full extent is not visible.[28][29]
Maintenance documentation records the required functions and the outcomes of inspection or operational tests. The guidelines do not provide one universal test interval for every protective device, and their emphasis is on maintaining the designed arrangement and recording its condition. Product-specific and jurisdiction-specific details require the applicable supporting documents.[28]
What the system is intended to protect
Atria connect spaces that might otherwise be separated into smaller compartments. Without suitable barriers, smoke can spread through the shared volume and reach communicating areas; Milke identifies this as a different problem from smoke control in a well-compartmented building. Pressure differences across barriers cannot perform the same function where the required physical separation is absent.[30]
The large volume can initially moderate the hazard. Air mixed into the plume reduces the concentration of combustion products and lowers the smoke temperature; however, dilution also increases the quantity of gas delivered to the layer. A benefit in concentration therefore accompanies an increased smoke-handling demand.[31]
Life-safety assessment considers several properties of the smoke environment. These include layer-interface height, visibility, temperature and the concentrations of harmful gases. The layer height describes whether an occupied level becomes immersed in smoke; it does not, by itself, describe the severity of every possible exposure within that layer.[31]
Reduced visibility can slow movement and increase disorientation. Milke also describes the potential for trips and falls where occupants cannot see obstructions or balcony edges. Longer evacuation then extends the period of exposure to smoke. A low predicted temperature does not remove these visibility-related effects.[31]
Property objectives can differ from life-safety objectives. Smoke can stain contents, expose equipment to corrosive products and interrupt the use of a building. A smoke concentration that permits short-term movement can still be unacceptable for sensitive contents. The chosen performance objective therefore influences the conditions that the system is intended to maintain.[31]
See also
Notes
- ↑ 1.0 1.1 Klote (2002), pp. 4-289–4-290.
- ↑ 2.0 2.1 Cote et al. (2008), §18.3, pp. 18-51–18-52.
- ↑ 3.0 3.1 3.2 Cote et al. (2008), §18.3, p. 18-52.
- ↑ Cote et al. (2008), §18.3, pp. 18-43, 18-51–18-52.
- ↑ 5.0 5.1 5.2 Klote (2002), pp. 4-278–4-282.
- ↑ Cote et al. (2008), §10.4, pp. 10-72–10-74.
- ↑ Cote et al. (2008), §20.20, pp. 20-217–20-220.
- ↑ Klote (2002), pp. 4-278–4-279.
- ↑ Klote (2002), pp. 4-279–4-281.
- ↑ 10.0 10.1 10.2 Klote (2002), p. 4-290.
- ↑ Klote (2002), pp. 4-280–4-282.
- ↑ Klote (2002), pp. 4-280–4-281.
- ↑ Klote (2002), pp. 4-281–4-282.
- ↑ Cote et al. (2008), §14.4, p. 14-47.
- ↑ 15.0 15.1 Australian Building Codes Board (2020), Data Sheet C4, pp. 130–131.
- ↑ Australian Building Codes Board (2020), Data Sheet C4, pp. 131–132.
- ↑ Klote (2002), pp. 4-277–4-278.
- ↑ Klote (2002), p. 4-274.
- ↑ Klote (2002), p. 4-277.
- ↑ Klote (2002), pp. 4-278–4-279.
- ↑ Ministry of Business, Innovation and Employment (2025), pp. 14–15.
- ↑ 22.0 22.1 22.2 22.3 Iqbal and Salley (2004), p. F-19.
- ↑ 23.0 23.1 Klote (2002), p. 4-274.
- ↑ Klote (2002), p. 4-277.
- ↑ 25.0 25.1 Ministry of Business, Innovation and Employment (2025), p. 13.
- ↑ Klote (2002), pp. 4-277–4-279.
- ↑ Iqbal and Salley (2004), p. F-44.
- ↑ 28.0 28.1 28.2 Australian Building Codes Board et al. (2005), p. 1.6-9.
- ↑ Iqbal and Salley (2004), p. 17-8.
- ↑ Milke (2002), pp. 4-292–4-294.
- ↑ 31.0 31.1 31.2 31.3 Milke (2002), pp. 4-292–4-293.
References
- Australian Building Codes Board, National Research Council of Canada, International Code Council, & Department of Building and Housing New Zealand. (2005). International fire engineering guidelines. Australian Building Codes Board.
- Australian Building Codes Board. (2020). Fire safety verification method: Data sheets (Handbook annex, Print version 1.1).
- Cote, A. E., Grant, C. C., Hall, J. R., Jr., & Solomon, R. E. (Eds.). (2008). Fire protection handbook (20th ed.). National Fire Protection Association.
- Iqbal, N., & Salley, M. H. (2004). Fire dynamics tools (FDTs): Quantitative fire hazard analysis methods for the U.S. Nuclear Regulatory Commission fire protection inspection program (NUREG-1805). U.S. Nuclear Regulatory Commission.
- Klote, J. H. (2002). Smoke control. In P. J. DiNenno (Ed.), SFPE handbook of fire protection engineering (3rd ed., pp. 4-274–4-291). National Fire Protection Association.
- Milke, J. A. (2002). Analytical methods for determining fire resistance of steel members. In P. J. DiNenno (Ed.), SFPE handbook of fire protection engineering (3rd ed., pp. 4-209–4-238). National Fire Protection Association.
- Milke, J. A. (2002). Smoke management in covered malls and atria. In P. J. DiNenno (Ed.), SFPE handbook of fire protection engineering (3rd ed., pp. 4-292–4-310). National Fire Protection Association.
- Ministry of Business, Innovation and Employment. (2025). C protection from fire: Verification method C/VM2 (2nd ed.).