Skip to content
From Fire Safety Academy Wiki
Contents
  1. 1Summary
  2. 2Licensing

Fse-protective-action-decision-model-v4.svg (SVG file, nominally 900 × 600 pixels, file size: 10 KB)

Summary

Typical delays before the start of evacuation in drills and real fires, as means or medians. Based on Proulx (2002), pp. 3-348–3-349, and Averill et al. (2005), pp. 220–221.

Original illustration for Protective action decision model, level 4 Expert.

  • Source basis: Proulx (2002), pp. 3-348–3-349; Averill et al. (2005), pp. 220–221.
  • Alt text: Bar chart of delays before evacuation: under a minute in a store and offices, about 3 minutes with an audible home alarm, 9 with a quiet one.

Licensing

New drawing by Fire Safety Academy. © Fire Safety Academy.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:34, 2 November 2026Thumbnail for version as of 17:34, 2 November 2026900 × 600 (10 KB)Jan (talk | contribs)Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity

The following page uses this file:

Metadata