Contents
Fse-protective-action-decision-model-v4.svg (SVG file, nominally 900 × 600 pixels, file size: 10 KB)
Summary
Typical delays before the start of evacuation in drills and real fires, as means or medians. Based on Proulx (2002), pp. 3-348–3-349, and Averill et al. (2005), pp. 220–221.
Original illustration for Protective action decision model, level 4 Expert.
- Source basis: Proulx (2002), pp. 3-348–3-349; Averill et al. (2005), pp. 220–221.
- Alt text: Bar chart of delays before evacuation: under a minute in a store and offices, about 3 minutes with an audible home alarm, 9 with a quiet one.
Licensing
New drawing by Fire Safety Academy. © Fire Safety Academy.
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 17:34, 2 November 2026 | 900 × 600 (10 KB) | Jan (talk | contribs) | Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity |
You cannot overwrite this file.
File usage
The following page uses this file: