Contents
Fse-performance-based-design-v4.svg (SVG file, nominally 900 × 600 pixels, file size: 7 KB)
Summary
The available safe egress time must exceed the required safe egress time by an agreed safety margin. Based on National Research Council of Canada et al. (2005), p. 1.2-22 and Van Rossum (2027), §7.1.
Original vector illustration for Performance-based design, level 2 Intermediate.
- Source basis: National Research Council of Canada et al. (2005), p. 1.2-22 (ASET-RSET time-line with safety margin); Van Rossum (2027), §7.1 (safety margin as factor or difference); redraw, do not copy
- Alt text: Timeline from ignition: RSET bar ends before ASET bar; the gap between them is the safety margin.
Licensing
New drawing by Fire Safety Academy. © Fire Safety Academy.
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 17:39, 2 November 2026 | 900 × 600 (7 KB) | Lisa (talk | contribs) | Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity |
You cannot overwrite this file.
File usage
The following page uses this file: