Contents
Fse-event-tree-analysis-v2.svg (SVG file, nominally 900 × 600 pixels, file size: 8 KB)
Summary
A branch can require successful action before a scenario-specific deadline. Based on Barry (2002), p. 5-184 and pp. 5-199–5-200.
Original illustration for Event tree analysis, level 3 Advanced.
- Source basis: Barry (2002), p. 5-184 and pp. 5-199–5-200; original explanatory synthesis, not a reproduction of a numerical source timeline.
- Alt text: Two timelines compare protective action before and after the same critical-condition deadline.
- Accuracy notes: Neither strip supplies a design response time. Avoid a universal sequence suggesting every protection system requires separate electronic detection.
Licensing
New drawing by Fire Safety Academy. © Fire Safety Academy.
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 17:13, 2 November 2026 | 900 × 600 (8 KB) | Emma (talk | contribs) | Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity |
You cannot overwrite this file.
File usage
The following page uses this file: