From Fire Safety Academy Wiki
Revision as of 01:32, 16 November 2026 by Peter (talk | contribs) (Wiki review: corrected 11 errors: citation (11) (Claude Opus 5.5))
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Contents
  1. 1Pressure maintenance and starting sequence
  2. 2Starting, control and supervision
  3. 3Pump operation and selection
  4. 4Comparing supply and demand
  5. 5Rapid changes and pressure waves
  6. 6Measuring the available supply
  7. 7Inspection and evidence of readiness
  8. 8See also
  9. 9Notes
  10. 10References

Jockey pump is a small pressure-maintenance pump that replenishes minor losses in a pressurised fire protection system. [1][2] Its purpose is to limit unnecessary starts of the main fire pump while preserving the intended demand response. The operating settings interact with supply pressure, pump shutoff pressure and controller behaviour. The small pump's ability to maintain static pressure does not demonstrate adequate fire-flow capacity. [2][3]

The engineering assessment combines the source, pump, driver, controls and delivery route. Static pressure is only one observation within that chain. Flowing performance, maximum pressure and the capacity to continue for the required duration answer different questions. Records of the installed arrangement and suitable tests connect the calculated duty to the equipment that must operate during a fire. [4][5] Starting tests and flowing tests exercise different functions. [5]

Pressure maintenance and starting sequence

Small leakage or pressure changes in a sprinkler system can cause repeated starts of its main pump; a jockey pump addresses this pressure-maintenance duty within the fire water supply. It is not selected as a substitute for the main fire pump's firefighting discharge. The difference is between maintaining readiness pressure and meeting a sustained fire demand. [1][2]

Jockey pump: functional relationships. Measurement and water paths are distinct.
Jockey pump: functional relationships. Schematic explanation; dimensions are not installation instructions.

The fire pump controller and the pressure-maintenance control need a coordinated sequence; the handbook discusses the consequences of inappropriate setpoints and unstable pressure response. These conditions can produce unnecessary starts or adverse pressure changes. A pressure-regulating valve has a different task, controlling downstream pressure rather than replenishing minor system losses. [2][6]

Water hammer is relevant when pump starts or stops create rapid changes in velocity; correct static readings do not describe that transient behaviour. The pressure-maintenance arrangement is therefore assessed alongside the pump curve and the response of the connected pipework. A start test records the intended sequence, while flow tests answer the separate question of delivery capability. [7][5]

Starting, control and supervision

Automatic starting connects a developing demand to pump operation without waiting for personnel at the pump; a pressure-sensing arrangement is one means of detecting that demand. Its usefulness depends on the sensing connection, pressure settings and available power or engine-starting system. A running pump indication alone does not demonstrate that sufficient water reaches the protected area. [8][5]

Starting and supervision chain. Measurement and water paths are distinct.
Starting and supervision chain. Schematic explanation; dimensions are not installation instructions.

A pressure-maintenance pump serves a different purpose; it replenishes small losses and limits repeated starts of the main fire pump. The pressure settings of both pumps need coordinated interpretation with the supply and pump curve. A pressure-maintenance arrangement that masks fire demand or produces unsuitable pressure transitions undermines the intended sequence. [1][2]

Fire-pump motor control differs from ordinary machinery protection because continuing water delivery during a fire is a central design objective; the handbook describes a deliberately different response to some overload conditions. This does not mean that electrical fault protection is absent. Short-circuit capability, power switching and the controller's equipment ratings remain separate design concerns. [9]

Diesel controls distinguish warning conditions from those requiring shutdown; the handbook discusses low oil pressure, high temperature and starting failure as alarm conditions, while overspeed has a shutdown function. These distinctions avoid treating every engine warning as an instruction to stop firefighting water. Their implementation belongs to the specified fire-pump driver and controller arrangement. [10]

Supervision communicates an abnormal state so that it can be addressed; it does not physically restore an isolated supply, replenish a tank or remove a pipe obstruction. An alarm path also introduces receiving, interpretation and response functions. The system assessment therefore includes what is monitored, where the signal goes and what operational condition it actually represents. [11][12]

Testing must exercise the function under examination; a start initiated by a simulated pressure decrease checks a different chain from a full-flow test. Alarm bypass testing checks a different chain from actual discharge through a remote connection. Recorded results need enough context to distinguish a successful component operation from successful delivery by the complete system. [13]

Pump operation and selection

A centrifugal pump transfers shaft energy to water through a rotating impeller; its performance varies with flow, speed and pump geometry. The selected duty belongs on a curve showing this relationship, rather than being defined by a single pressure reading. The complete operating point also depends on the resistance and supply conditions of the connected installation. [14][15]

Pump and installed system. Measurement and water paths are distinct.
Pump and installed system. Schematic explanation; dimensions are not installation instructions.

The pump head is the energy added across the pump; discharge pressure alone is not that quantity when suction pressure, elevation or velocity differ between measuring points. Horizontal pumps and vertical turbine arrangements require appropriate references for their respective configurations. A test comparison can be misleading if the water level or suction reference has changed without being recorded. [16]

A centrifugal pump normally develops its greatest head near shutoff and less head at higher flows; the closed-outlet condition therefore needs assessment for maximum system pressure. At the other end of the operating range, the remaining head must meet the required discharge pressure after losses. Driver capability and suction conditions can constrain operation even where the plotted head appears adequate. [17][3]

The handbook's account of United States NFPA 20 practice describes a rated point, a high-flow point and a shutoff limit. It reports at least 65% of rated head at 150% of rated flow, with shutoff head no greater than 140%. These are historical criteria reported in the 2008 handbook. They are not a substitute for a selected pump's actual curve or a statement of a current adopted standard. [18]

Connecting pumps in series adds their heads at a common flow; connecting them in parallel combines flow at a common head. Neither arrangement automatically doubles delivery through the installed network, because the operating intersection changes. Shared suction piping and power dependencies also remain part of the installation rather than disappearing through duplication. [19][20]

The water source must be assessed alongside the pump; a booster can overcome insufficient pressure but cannot create an absent water reserve. A powerful driver cannot correct an obstructed intake or inadequate suction conditions. Selection therefore brings together the source, suction route, performance curve, driver, controls and downstream demand. [21][3]

Comparing supply and demand

Supply and demand curves answer complementary questions; a supply curve gives the pressure available at different flows under stated conditions. A demand calculation gives the pressure needed to deliver the selected flow through the protection system. Their comparison is meaningful only at a common reference point and for compatible operating assumptions. [22]

A common water-supply approximation treats the pressure drop from the test's static value as proportional to flow raised to the power 1.85. The relation can interpolate a measured pressure-flow pair and supports the traditional transformed-axis graph. It is an empirical representation of a network, not a physical guarantee at every extrapolated flow. [23][24]

p(Q)=ps−(ps−pr)(QQt)1.85

Symbol Description Unit
ps,pr Static and test residual pressures kPa
Qt Measured test discharge L/min
Q,p(Q) Investigated flow and predicted pressure L/min; kPa

Using the pressure and flow inputs in Fleming's printed example gives a useful arithmetic check; converted to SI, they are approximately 689 kPa static and 552 kPa residual at 3,785 L/min. At 1,703 L/min, the equation gives approximately 658 kPa. This recalculation uses the stated inputs; it does not reproduce the inconsistent intermediate answer printed in that example. [23]

A pump adds a further pressure-flow relationship; the available inlet pressure combines with the differential head developed by the pump, after appropriate elevation and velocity corrections. The resulting supply is not obtained by adding the rated pump pressure at every flow. Both high-flow delivery and low-flow maximum pressure need consideration. [25][26]

The calculation must also preserve the difference between capacity and duration; a source may meet a demand point initially while exhausting a finite reserve too soon. Two paths may appear redundant while sharing one vulnerable source or connecting segment. Pressure-flow agreement is therefore one part of demonstrating the performance of the complete supply arrangement. [27][28]

Rapid changes and pressure waves

Water hammer results from rapid changes in water velocity; the water and the surrounding pipe deform as a pressure disturbance travels through the system. Valve movements, pump transitions and reversal of flow can initiate the disturbance. A steady hydraulic calculation does not describe this sequence because it omits wave travel and changing boundary conditions. [29][7]

For a simple rapid velocity change, the Joukowsky relation estimates the initial pressure change; the wave speed depends on the water and the elastic response of the pipe. It is not the same as the much slower bulk flow velocity. The sign of the velocity change and the system boundaries determine whether a pressure rise or reduction develops. [29]

Δp=ρaΔv,tc=2La

Symbol Description Unit
Δp Initial pressure change Pa
ρ,a,Δv Density, wave speed and velocity change kg/m³; m/s; m/s
tc,L Critical round-trip time and relevant pipe length s; m

The round-trip time compares the duration of a flow change with the time taken for a wave to travel and return. It explains why the same valve movement can behave differently in different pipe systems. The simple rapid-change estimate is not a prediction of every later pressure peak. Reflections and interacting waves can alter the subsequent history. [29][30]

A normalised illustration uses water density of 1,000 kg/m³ and an assumed wave speed of 1,000 m/s. Arresting 1 m/s of flow gives an initial pressure rise of 1,000 kPa from the equation. These deliberately stated illustrative inputs show the scale of the mechanism, rather than describing a measured installation. Actual wave speed and boundary conditions require their own determination. [31]

The handbook also describes column separation and subsequent reversal as potential sources of damaging surge; a relief valve responding to pressure does not necessarily remove a fast transient before it develops. Pipe supports and pressure ratings address consequences but do not determine the pressure history. Complex networks require an analysis that represents the relevant valves, pumps, reflections and operating sequence. [7][32]

Measuring the available supply

A supply test relates an observed discharge to the pressure remaining elsewhere in the connected system; the initial static reading describes the condition before the test discharge begins. The residual reading describes the pressure while the measured discharge is flowing. Both belong to the same test arrangement and must be recorded with its location and operating conditions. [23][33]

The flowing outlet and the pressure observation have different functions; a pitot measurement in an appropriate free jet supports an estimate of outlet flow. A gauge at the residual hydrant measures pressure in the distribution system during that discharge. Substituting jet pressure for residual system pressure confuses two different physical quantities. [33][23]

The discharge estimate depends on outlet geometry and the coefficient representing its losses; a disturbed or nonuniform jet makes a single point reading less representative. Probe alignment and position also influence the measurement. For some discharge devices, a calibrated nozzle or suitable flowmeter provides a more appropriate method than applying a simple pitot relation. [33]

Test results describe a network state, rather than an unlimited promise of future supply; domestic demand, pumps, source levels and closed valves can change that state. The pressure reference must also be carried correctly to the building calculation. A test performed at a different elevation or upstream of additional resistance needs hydraulic interpretation before comparison with system demand. [34][22]

A main-drain test provides a different kind of evidence; the handbook uses changes from previous static and flowing readings to identify possible deterioration or obstruction. This is useful for detecting change, but it does not independently establish the full sprinkler demand. Test opening, supply state and instrument condition affect whether successive observations are comparable. [35]

Pump testing likewise separates a start test from a flow-performance test; running successfully without substantial discharge demonstrates some operating functions but does not establish the entire pump curve. Flowing observations across the relevant operating range give evidence about delivery capability. The handbook describes retaining records so that deterioration and the ability to meet system demand can be assessed. [5]

Inspection and evidence of readiness

Inspection, testing and maintenance provide different forms of evidence; visual inspection can identify closed valves, damaged sprinklers, unsuitable storage or missing components. A functional test can demonstrate operation under a defined condition. Maintenance addresses deterioration or defects, while records connect those actions to the installation's intended state. [36]

The handbook treats changes in occupancy, materials, partitions, ceilings and heating as relevant to sprinkler performance; a system can remain mechanically intact while its design assumptions no longer match the protected hazard. An inspection limited to leaks or gauge readings would miss that change. Readiness therefore includes both equipment condition and the continued relevance of the design basis. [37]

An indicating control valve makes its position observable, while electrical supervision can report departure from the intended position; neither proves that every downstream route is unobstructed. Flow testing provides different evidence by exercising a water path. Valve identification and drawings help establish which part of the protection is affected by a particular closure. [38][39]

Deposits on a sprinkler can interfere with heating or mechanical release; corrosion can affect both the operating mechanism and water passage. Inside pipes, scale or foreign material can migrate to smaller fittings and outlets. These mechanisms explain why an apparently pressurised system may still have reduced effective protection. [40]

The purpose of a test determines its interpretation; an alarm test can establish signalling without demonstrating the full water demand. A main-drain comparison can reveal a changed supply condition without reproducing every operating sprinkler. A pump start test exercises starting functions, while a flow test examines delivery capability over selected operating points. [41][13]

The International Fire Engineering Guidelines (IFEG) links commissioning to the performance assumed in a fire engineering evaluation; it also links subsequent management and maintenance to keeping those assumptions valid. This provides a useful framework for reading test records: the observation must answer the performance question being claimed. Successful operation of one component is evidence about that component and the functions actually exercised. [42]

See also

Notes

  1. ↑ 1.0 1.1 1.2 Cote (2008), ch. 15.4, p. 15-64.
  2. ↑ 2.0 2.1 2.2 2.3 2.4 Cote (2008), ch. 15.7, pp. 15-132–15-134.
  3. ↑ 3.0 3.1 3.2 Titus (2002), ch. 4-2, pp. 4-68–4-69.
  4. ↑ Cote (2008), ch. 15.6, pp. 15-89–15-99.
  5. ↑ 5.0 5.1 5.2 5.3 5.4 Cote (2008), ch. 16.11, p. 16-220.
  6. ↑ Cote (2008), ch. 16.10, pp. 16-200–16-201.
  7. ↑ 7.0 7.1 7.2 Cote (2008), ch. 15.3, pp. 15-59–15-60.
  8. ↑ Cote (2008), ch. 15.7, pp. 15-114–15-115,15-132–15-134.
  9. ↑ Cote (2008), ch. 15.7, pp. 15-106,15-113–15-115,15-133.
  10. ↑ Cote (2008), ch. 15.6, p. 15-99.
  11. ↑ Cote (2008), ch. 14.4, pp. 14-40–14-43.
  12. ↑ Cote (2008), ch. 16.11, p. 16-212.
  13. ↑ 13.0 13.1 Cote (2008), ch. 16.11, pp. 16-210–16-211,16-220.
  14. ↑ Cote (2008), ch. 15.6, pp. 15-85,15-89–15-92.
  15. ↑ Titus (2002), ch. 4-2, pp. 4-67–4-69.
  16. ↑ Cote (2008), ch. 15.6, pp. 15-89–15-90.
  17. ↑ Cote (2008), ch. 15.6, pp. 15-91–15-98.
  18. ↑ Cote (2008), ch. 15.6, p. 15-92.
  19. ↑ Titus (2002), ch. 4-2, p. 4-70.
  20. ↑ Cote (2008), ch. 15.6, pp. 15-93–15-95.
  21. ↑ Cote (2008), ch. 15.6, pp. 15-91–15-99.
  22. ↑ 22.0 22.1 Fleming (2002), ch. 4-3, pp. 4-81–4-83.
  23. ↑ 23.0 23.1 23.2 23.3 Fleming (2002), ch. 4-3, p. 4-81.
  24. ↑ Titus (2002), ch. 4-2, pp. 4-52–4-53.
  25. ↑ Titus (2002), ch. 4-2, pp. 4-68–4-70.
  26. ↑ Cote (2008), ch. 15.6, pp. 15-89–15-94.
  27. ↑ Fleming (2002), ch. 4-3, pp. 4-83–4-84.
  28. ↑ Hopkins et al. (2005), pp. xxxvii–xlii.
  29. ↑ 29.0 29.1 29.2 Titus (2002), ch. 4-2, pp. 4-65–4-67.
  30. ↑ Cote (2008), ch. 15.3, p. 15-60.
  31. ↑ Titus (2002), ch. 4-2, pp. 4-44,4-65–4-67.
  32. ↑ Titus (2002), ch. 4-2, p. 4-67.
  33. ↑ 33.0 33.1 33.2 Cote (2008), ch. 15.3, pp. 15-46–15-47.
  34. ↑ Cote (2008), ch. 15.2, pp. 15-23–15-24.
  35. ↑ Cote (2008), ch. 16.11, pp. 16-210–16-211.
  36. ↑ Cote (2008), ch. 16.11, pp. 16-205–16-212.
  37. ↑ Cote (2008), ch. 16.11, p. 16-205.
  38. ↑ Cote (2008), ch. 16.3, pp. 16-42–16-43.
  39. ↑ Cote (2008), ch. 16.11, pp. 16-209–16-210.
  40. ↑ Cote (2008), ch. 16.11, pp. 16-207–16-212.
  41. ↑ Cote (2008), ch. 14.4, pp. 14-42–14-43.
  42. ↑ National Research Council of Canada et al. (2005), p. 1.7-8.

References

  • Cote, A. E. (Ed.). (2008). Fire protection handbook (20th ed.). National Fire Protection Association.
  • Fleming, R. P. (2002). Automatic sprinkler system calculations. In P. J. DiNenno (Ed.), SFPE handbook of fire protection engineering (3rd ed., pp. 4-72–4-87). National Fire Protection Association.
  • Hopkins, M., Schoenrock, J., & Budnick, E. (2005). Fire suppression systems (NIST NCSTAR 1-4B). National Institute of Standards and Technology.
  • National Research Council of Canada, International Code Council, Department of Building and Housing, & Australian Building Codes Board. (2005). International fire engineering guidelines. Australian Building Codes Board.
  • Titus, J. J. (2002). Hydraulics. In P. J. DiNenno (Ed.), SFPE handbook of fire protection engineering (3rd ed., pp. 4-44–4-71). National Fire Protection Association.