Skip to content
From Fire Safety Academy Wiki
Revision as of 09:21, 13 November 2026 by Mark (talk | contribs) (Remove source references from file description)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Contents
  1. 1Summary
  2. 2Licensing

Fse-progressive-horizontal-evacuation-v3.svg (SVG file, nominally 900 × 600 pixels, file size: 10 KB)

Summary

Ideal concurrent teams change the illustrative total allowance for six patients.

Original illustration for Progressive horizontal evacuation, level 3 Advanced.

  • Alt text: Three bars compare illustrative patient-transfer allowances of 780, 420 and 300 seconds for different team counts.
  • Accuracy notes: All cycles retain the full source return allowance. Do not label this an exact last-arrival prediction or assume the required staff are available.

Licensing

New drawing by Fire Safety Academy. © Fire Safety Academy.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:08, 2 November 2026Thumbnail for version as of 17:08, 2 November 2026900 × 600 (10 KB)Emma (talk | contribs)Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity

The following page uses this file:

Metadata