Skip to content
From Fire Safety Academy Wiki
Revision as of 17:10, 2 November 2026 by Emma (talk | contribs) (Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Contents
  1. 1Summary
  2. 2Licensing

Fse-acceptance-criteria-v2.svg (SVG file, nominally 900 × 600 pixels, file size: 10 KB)

Summary

The same available time can satisfy or fail a stated margin criterion when evacuation time changes. Based on Australian Building Codes Board et al. (2005), p. 1.2-22, with hypothetical values.

Original illustration for Acceptance criteria, level 3 Advanced.

  • Source basis: Australian Building Codes Board et al. (2005), p. 1.2-22, unnumbered evacuation timeline; redraw, do not copy. Hypothetical values from calculations/acceptance-criteria.py.
  • Alt text: Two evacuation timelines compare margins of 150 seconds and 60 seconds with an illustrative required margin of 90 seconds.
  • Accuracy notes: The 90-second criterion is illustrative, not a prescribed or universally safe value. Use an accurately shared time scale.

Licensing

New drawing by Fire Safety Academy. © Fire Safety Academy.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:10, 2 November 2026Thumbnail for version as of 17:10, 2 November 2026900 × 600 (10 KB)Emma (talk | contribs)Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity

The following page uses this file:

Metadata