Skip to content

List of redirects

Tools

Showing below up to 50 results in range #301 to #350.

View ( | ) (20 | 50 | 100 | 250 | 500)

  1. RTI → Response time index
  2. Rate of heat release per unit area → Heat release rate per unit area
  3. Required safe egress time (RSET) → Required safe egress time
  4. Required safe evacuation time → Required safe egress time
  5. Response time index (RTI) → Response time index
  6. Restraint of thermal expansion → Restrained thermal expansion
  7. Reverse stack effect → Stack effect
  8. Risk of fire → Fire risk
  9. Room/corner test → Room corner test
  10. Runaway reaction → Thermal runaway
  11. SHEV → Smoke and heat exhaust ventilation
  12. Safe path → Protected escape route
  13. Schematic design fire → Design fire
  14. Secondary dust explosion → Dust explosion
  15. Secondary explosion → Dust explosion
  16. Self heating → Self-heating
  17. Shape factor → View factor
  18. Shelter in place → Stay-put strategy
  19. Smoke-proof wall → Smoke barrier
  20. Smoke and heat exhaust ventilation (SHEV) → Smoke and heat exhaust ventilation
  21. Smoke and heat extraction → Smoke and heat exhaust ventilation
  22. Smoke and heat venting → Smoke and heat exhaust ventilation
  23. Smoke control system → Smoke control
  24. Smoke detector response time → Detector activation time
  25. Smoke gas explosion → Smoke explosion
  26. Smoke management → Smoke control
  27. Smoke separation → Smoke barrier
  28. Smoke toxicity → Fire toxicity
  29. Smoldering → Smouldering
  30. Smoldering-to-flaming transition → Smouldering-to-flaming transition
  31. Society of Fire Protection Engineers → SFPE
  32. Solid flame radiation model → Solid flame model
  33. Specific heat → Specific heat capacity
  34. Speed of movement → Walking speed
  35. Spill plume → Balcony spill plume
  36. Spontaneous ignition temperature → Autoignition temperature
  37. Sprinkler/vent interaction → Sprinkler-vent interaction
  38. Sprinkler activation time → Detector activation time
  39. Staged evacuation → Phased evacuation
  40. Stair pressurization → Stair pressurisation
  41. Stairwell pressurisation → Stair pressurisation
  42. Stairwell pressurization → Stair pressurisation
  43. Standard fire resistance test → Fire resistance test
  44. Standard temperature-time curve → Standard fire curve
  45. Standard time-temperature curve → Standard fire curve
  46. Standpipe → Dry and wet risers
  47. Standpipe system → Dry and wet risers
  48. Stay in place → Stay-put strategy
  49. Street hydrant → Fire hydrant
  50. Structural adequacy → Fire resistance criteria

View ( | ) (20 | 50 | 100 | 250 | 500)