Showing below up to 50 results in range #251 to #300.
- Net heat of combustion → Heat of combustion
- Net heat of complete combustion → Heat of combustion
- Neutral pressure plane → Neutral plane
- Non-dimensional heat release rate → Dimensionless heat release rate
- Non-premixed flame → Diffusion flame
- Occupant loads → Occupant load
- Opposed flow flame spread → Opposed-flow flame spread
- Opposed flow spread → Opposed-flow flame spread
- Optical flame detector → Flame detector
- Over-ventilated fire → Fuel-controlled fire
- Overventilated fire → Fuel-controlled fire
- Oxygen consumption calorimetry → Oxygen consumption principle
- Oxygen consumption method → Oxygen consumption principle
- Oxygen vitiation → Oxygen depletion
- Parametric fire → Parametric fire curve
- Parametric heating curve → Parametric fire curve
- Parametric temperature-time curve → Parametric fire curve
- Parking garage fire → Car park fire
- Perfect gas → Ideal gas law
- Perfect gas law → Ideal gas law
- Performance-based fire safety design → Performance-based design
- Performance based design → Performance-based design
- Physical explosion → Explosion
- Plastic in fire → Plastics in fire
- Plug-holing → Plugholing
- Point-source model → Point source model
- Polymers in fire → Plastics in fire
- Population risk → Societal risk
- Portable extinguisher → Fire extinguisher
- Portable fire extinguisher → Fire extinguisher
- Post-fire investigation → Fire investigation
- Post-flashover → Post-flashover fire
- Postflashover fire → Post-flashover fire
- Pre-evacuation time → Pre-movement time
- Pre-travel activity time → Pre-movement time
- Pre-travel time → Pre-movement time
- Premixed burning → Premixed flame
- Premixed combustion → Premixed flame
- Premovement time → Pre-movement time
- Prescriptive code → Prescriptive design
- Probabilistic risk assessment → Quantitative risk assessment
- Products of incomplete combustion → Incomplete combustion
- Projected beam detector → Beam smoke detector
- Projected beam smoke detector → Beam smoke detector
- Protect in place → Stay-put strategy
- Protected exit → Protected escape route
- QRA → Quantitative risk assessment
- Quantitative risk analysis → Quantitative risk assessment
- Quantitative risk assessment (QRA) → Quantitative risk assessment
- RSET → Required safe egress time