New FSE wiki article: Decontamination (written by Claude Opus 5.5) |
FSE wiki: fact-check corrections (written by Claude Opus 5.5) |
||
| Line 1: | Line 1: | ||
'''Decontamination''', also called contamination reduction, is the removal or neutralisation of contaminants from people and equipment after a hazardous materials release, so that foreseeable adverse health effects do not occur outside the area of exposure.<ref name="Wr-13-140">C. J. Wright (2008a), p. 13-140.</ref> In the response model of the ''Fire Protection Handbook'' (20th edition, 2008), a decontamination process is chosen for every response option.<ref name="Wr-13-137">C. J. Wright (2008a), p. 13-137.</ref> It is carried out in the warm zone, between the contaminated hot zone and the clean cold zone.<ref name="Wr-13-142">C. J. Wright (2008a), p. 13-142.</ref> Possible methods are absorption, adsorption, chemical degradation, dilution, neutralisation and solidification, tailored to the hazards of the incident.<ref name="Wr-13-140" /> | '''Decontamination''', also called contamination reduction, is the removal or neutralisation of contaminants from people and equipment after a hazardous materials release, so that foreseeable adverse health effects do not occur outside the area of exposure.<ref name="Wr-13-140">C. J. Wright (2008a), p. 13-140.</ref> In the response model of the ''Fire Protection Handbook'' (20th edition, 2008), a decontamination process is chosen for every response option.<ref name="Wr-13-137">C. J. Wright (2008a), p. 13-137.</ref> It is carried out in the warm zone, between the contaminated hot zone and the clean cold zone.<ref name="Wr-13-142">C. J. Wright (2008a), p. 13-142.</ref> Possible methods are absorption, adsorption, chemical degradation, dilution, neutralisation and solidification, tailored to the hazards of the incident.<ref name="Wr-13-140" /> | ||
A New York City fire department plan of 1994 calls decontamination one of the most important steps in ensuring personal safety at a hazardous materials emergency.<ref name="LV-A-3.3">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §3.3.</ref> Its personnel procedure includes showers and a medical check.<ref name="LV-A-5.3">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.3.</ref> Decontamination also covers protective clothing, tools and apparatus | A New York City fire department plan of 1994 calls decontamination one of the most important steps in ensuring personal safety at a hazardous materials emergency.<ref name="LV-A-3.3">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §3.3.</ref> Its personnel procedure includes showers and a medical check.<ref name="LV-A-5.3">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.3.</ref> Decontamination also covers protective clothing, tools and apparatus.<ref name="Wr-13-140" /> Some contaminated garments cannot be decontaminated and must then be discarded.<ref name="Tee-12-146">Teele (2008), p. 12-146.</ref> The sources also describe decontamination after radioactive releases and, in a Dutch study, of firefighters' clothing after fires in electric vehicles.<ref name="Dav-7-53">Davenport (2008), p. 7-53.</ref><ref name="VdG-30">Van der Graaf et al. (2021/2023), p. 30.</ref> | ||
== Definition and purpose == | == Definition and purpose == | ||
C. J. Wright defines decontamination, or contamination reduction, as the act of removing or neutralising contaminants from equipment or personnel to preclude foreseeable adverse health effects outside the engulfed area.<ref name="Wr-13-140" /> The engulfed area is the actual or potential area of exposure to a hazardous material.<ref name="Wr-13-134">C. J. Wright (2008a), p. 13-134.</ref> The plan of the Fire Department of the City of New York (FDNY) gives a similar definition. Decontamination is the process of making personnel, equipment and supplies safe by reducing present levels of poisonous or otherwise harmful substances.<ref name="LV-A-3.3" /> | C. J. Wright defines decontamination, or contamination reduction, as the act of removing or neutralising contaminants from equipment or personnel to preclude foreseeable adverse health effects outside the engulfed area.<ref name="Wr-13-140" /> The engulfed area is the actual or potential area of exposure to a hazardous material.<ref name="Wr-13-134">C. J. Wright (2008a), p. 13-134.</ref> The plan of the Fire Department of the City of New York (FDNY) gives a similar definition. Decontamination is the process of making personnel, equipment and supplies safe by reducing present levels of poisonous or otherwise harmful substances.<ref name="LV-A-3.3" /> | ||
The need arises because personnel, protective equipment, apparatus, tools and equipment may become contaminated at a hazardous materials incident.<ref name="Wr-13-140" /> Decontamination is part of the system that prevents or reduces the physical transfer of contaminants from the site by people and equipment.<ref name="LV-A-5.3" /> The FDNY plan treats site control as two activities: the physical arrangement and control of the work areas, and the removal of contaminants from people and equipment.<ref name="LV-A-3.2">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §3.2.</ref> The plan adds that the success of decontamination depends on the ability of the incident commander to keep control of personnel at the site.<ref name="LV-A-3.3" /> | The need arises because personnel, protective equipment, apparatus, tools and equipment may become contaminated at a hazardous materials incident.<ref name="Wr-13-140" /> Decontamination is part of the system that prevents or reduces the physical transfer of contaminants from the site by people and equipment.<ref name="LV-A-5.3" /> The FDNY plan treats site control as two activities: the physical arrangement and control of the work areas, and the removal of contaminants from people and equipment.<ref name="LV-A-3.2">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §3.2.</ref> The plan adds that the success of decontamination depends on the ability of the incident commander to keep control of personnel at the site.<ref name="LV-A-3.3" /> | ||
| Line 11: | Line 11: | ||
== Place in the hazardous materials response == | == Place in the hazardous materials response == | ||
In the [[hazardous materials response]] model described by Wright, decontamination appears in | In the [[hazardous materials response]] model described by Wright, decontamination appears in planning, implementation and evaluation. During planning, responders identify an appropriate decontamination process for each response option, alongside its protective equipment.<ref name="Wr-13-137" /> Materials for decontamination are among the resources counted when an option is selected, and decontamination procedures form one of the ten components of the plan of action.<ref name="Wr-13-141">C. J. Wright (2008a), p. 13-141.</ref> During implementation, decontamination is set up together with the control zones as part of scene control.<ref name="Wr-13-142" /> The final duty, evaluating progress, includes a check on how well the decontamination process is working.<ref name="Wr-13-143">C. J. Wright (2008a), p. 13-143.</ref> | ||
In the United States, the Hazardous Waste Operations and Emergency Response (HAZWOPER) rule in the Code of Federal Regulations (29 CFR 1910.120) links decontamination to each responder level. First responders at the operations level must know how to implement basic decontamination measures, and technicians must understand and implement decontamination procedures.<ref name="HN-13-89">Hildebrand and Noll (2008), p. 13-89.</ref> Specialists must be able to determine and implement them, and the on-scene incident commander must know and understand their importance.<ref name="HN-13-90">Hildebrand and Noll (2008), p. 13-90.</ref> NFPA 471, the recommended practice for responding to hazardous materials incidents, also covers decontamination.<ref name="HN-13-95">Hildebrand and Noll (2008), p. 13-95.</ref> An industrial fire brigade that acts as a hazmat team must have specific personnel decontamination procedures so that team members can safely leave a contaminated area.<ref name="Sny-12-197">Snyder (2008), p. 12-197.</ref> | In the United States, the Hazardous Waste Operations and Emergency Response (HAZWOPER) rule in the Code of Federal Regulations (29 CFR 1910.120) links decontamination to each responder level. First responders at the operations level must know how to implement basic decontamination measures, and technicians must understand and implement decontamination procedures.<ref name="HN-13-89">Hildebrand and Noll (2008), p. 13-89.</ref> Specialists must be able to determine and implement them, and the on-scene incident commander must know and understand their importance.<ref name="HN-13-90">Hildebrand and Noll (2008), p. 13-90.</ref> NFPA 471, the recommended practice for responding to hazardous materials incidents, also covers decontamination.<ref name="HN-13-95">Hildebrand and Noll (2008), p. 13-95.</ref> An industrial fire brigade that acts as a hazmat team must have specific personnel decontamination procedures so that team members can safely leave a contaminated area.<ref name="Sny-12-197">Snyder (2008), p. 12-197.</ref> | ||
| Line 29: | Line 29: | ||
Decontamination takes place in the warm zone, the area between the hot zone around the release and the cold zone with the command post.<ref name="Wr-13-142" /> Wright's diagram of control zones shows a decontamination corridor crossing the warm zone, with access control points on the hot line and on the contamination control line.<ref name="Wr-13-143" /> The FDNY plan called this zone the contamination reduction area and stated that all decontamination activities occur there.<ref name="LV-A-5.2.2">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.2.</ref> Its purpose is to prevent or reduce the transfer of contaminants picked up by personnel or equipment returning from the exclusion area, the plan's term for the hot zone.<ref name="LV-A-5.2.2" /> | Decontamination takes place in the warm zone, the area between the hot zone around the release and the cold zone with the command post.<ref name="Wr-13-142" /> Wright's diagram of control zones shows a decontamination corridor crossing the warm zone, with access control points on the hot line and on the contamination control line.<ref name="Wr-13-143" /> The FDNY plan called this zone the contamination reduction area and stated that all decontamination activities occur there.<ref name="LV-A-5.2.2">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.2.</ref> Its purpose is to prevent or reduce the transfer of contaminants picked up by personnel or equipment returning from the exclusion area, the plan's term for the hot zone.<ref name="LV-A-5.2.2" /> | ||
Two lines bound the corridor. The hot line separates the exclusion area from the contamination reduction area, and a decontamination station for personnel or equipment is set up close to it.<ref name="LV-A-5.2.2" /> The contamination control line separates the possibly contaminated area from the clean zone. Leaving the contamination reduction area for the clean area requires removal of suspected or known contaminated clothing and equipment.<ref name="LV-A-5.2.2" /> Unless otherwise demonstrated, everything leaving the exclusion area | Two lines bound the corridor. The hot line separates the exclusion area from the contamination reduction area, and a decontamination station for personnel or equipment is set up close to it.<ref name="LV-A-5.2.2" /> The contamination control line separates the possibly contaminated area from the clean zone. Leaving the contamination reduction area for the clean area requires removal of suspected or known contaminated clothing and equipment.<ref name="LV-A-5.2.2" /> Unless otherwise demonstrated, everything leaving the exclusion area should be considered contaminated.<ref name="LV-A-5.2.1">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.1.</ref> Potentially contaminated clothing and equipment are not permitted in the support area, where normal fire-fighting clothing is worn.<ref name="LV-A-5.2.3">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.3.</ref> | ||
The FDNY plan based its three-zone system and exacting decontamination procedures on a worst-case situation.<ref name="LV-A-5.2.5">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.5.</ref> Less stringent site control and decontamination could be used once air monitoring, instrument surveys and technical data gave more accurate information about the contaminants.<ref name="LV-A-5.2.5" /> A hazardous materials incident safety officer should ensure that hot, warm, decontamination and other zone designations are clearly marked and communicated to all members.<ref name="Lof-12-112">Loflin (2008), p. 12-112.</ref> People working in the corridor face their own exposure: Wright lists splashes during the decontamination of people or equipment among the exposure types to consider when selecting protective equipment.<ref name="Wr-13-139">C. J. Wright (2008a), p. 13-139.</ref> | The FDNY plan based its three-zone system and exacting decontamination procedures on a worst-case situation.<ref name="LV-A-5.2.5">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.5.</ref> Less stringent site control and decontamination could be used once air monitoring, instrument surveys and technical data gave more accurate information about the contaminants.<ref name="LV-A-5.2.5" /> A hazardous materials incident safety officer should ensure that hot, warm, decontamination and other zone designations are clearly marked and communicated to all members.<ref name="Lof-12-112">Loflin (2008), p. 12-112.</ref> People working in the corridor face their own exposure: Wright lists splashes during the decontamination of people or equipment among the exposure types to consider when selecting protective equipment.<ref name="Wr-13-139">C. J. Wright (2008a), p. 13-139.</ref> | ||
| Line 38: | Line 38: | ||
The procedure had nine steps. An entry point was marked to guide contaminated personnel into the area, and protective clothing was removed and isolated in sealed plastic bags placed in recovery drums.<ref name="LV-A-5.3.2" /> Members then entered the rear of the unit under the supervision of emergency medical service (EMS) personnel, removed personal effects and work clothing, and showered.<ref name="LV-A-5.3.2" /> After showering they received towels and clothing and left the unit.<ref name="LV-A-5.3.2" /> EMS personnel then took a medical history, checked vital signs and followed up complaints, usually in a medical vehicle on the clean side, and transported members who needed further care.<ref name="LV-A-5.3.2" /> Finally, the unit was disconnected, and the Department of Environmental Protection analysed the shower waste water.<ref name="LV-A-5.3.2" /> | The procedure had nine steps. An entry point was marked to guide contaminated personnel into the area, and protective clothing was removed and isolated in sealed plastic bags placed in recovery drums.<ref name="LV-A-5.3.2" /> Members then entered the rear of the unit under the supervision of emergency medical service (EMS) personnel, removed personal effects and work clothing, and showered.<ref name="LV-A-5.3.2" /> After showering they received towels and clothing and left the unit.<ref name="LV-A-5.3.2" /> EMS personnel then took a medical history, checked vital signs and followed up complaints, usually in a medical vehicle on the clean side, and transported members who needed further care.<ref name="LV-A-5.3.2" /> Finally, the unit was disconnected, and the Department of Environmental Protection analysed the shower waste water.<ref name="LV-A-5.3.2" /> | ||
The plan also tracked people and equipment. The Safety Operating Battalion Chief confirmed that all exposed members took part in the decontamination procedure, | The plan also tracked people and equipment. The Safety Operating Battalion Chief normally confirmed that all exposed members took part in the decontamination procedure; if that officer did not attend, the Special Operations Decon Officer performed this function. The Safety Chief recorded members' names and units with a description of the procedures used.<ref name="LV-A-6.1">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §6.1.</ref> Apparatus, tools, clothing and personal items stayed at the site until a member of the Special Operations Command had decided what needed decontamination.<ref name="LV-A-5.3.3">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.3.3.</ref> | ||
Potentially contaminated breathing-air cylinders were not to be exchanged.<ref name="LV-A-6.6">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §6.6.</ref> Decontamination was done at the scene where possible, so that apparatus and equipment could return to service; otherwise the decontamination officer set a time and site.<ref name="LV-A-4.3.6" /> The plan required the incident commander to review actions after each hazardous materials operation.<ref name="LV-A-9.1">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §9.1.</ref> | |||
== Protective clothing, equipment and fire stations == | == Protective clothing, equipment and fire stations == | ||
Protective clothing is both a barrier against contamination and a possible carrier of it. Teele notes that decontamination may not be possible when protective garments are contaminated with chemical, radiological or biological agents. Such garments should then be discarded in line with local, state and federal regulations.<ref name="Tee-12-146" /> Chlorine bleach must not be used for any cleaning, decontamination or disinfection of protective equipment, because some components lose their physical integrity or flame resistance.<ref name="Tee-12-146" /> For [[chemical protective clothing]] certified to NFPA 1991 or NFPA 1992, the manufacturer's technical data should include decontamination procedures.<ref name="Tee-12-157">Teele (2008), p. 12-157.</ref> Where a suit allows a choice, wearing the breathing apparatus inside the ensemble is strongly recommended, partly to reduce decontamination problems.<ref name="Tee-12-157" /> | Protective clothing is both a barrier against contamination and a possible carrier of it. Teele notes that decontamination may not be possible when protective garments are contaminated with chemical, radiological or biological agents. Such garments should then be discarded in line with local, state and federal regulations.<ref name="Tee-12-146" /> Chlorine bleach must not be used for any cleaning, decontamination or disinfection of protective equipment, because some components lose their physical integrity or flame resistance.<ref name="Tee-12-146" /> For [[chemical protective clothing]] certified to NFPA 1991 or NFPA 1992, the manufacturer's technical data should include decontamination procedures.<ref name="Tee-12-157">Teele (2008), p. 12-157.</ref> Where a suit allows a choice, wearing the breathing apparatus inside the ensemble is strongly recommended, partly to reduce decontamination problems.<ref name="Tee-12-157" /> | ||
Some ensembles are not meant to be decontaminated at all. NFPA 1994 ensembles for chemical, biological, radiological and nuclear (CBRN) terrorism incidents are intended as single-exposure equipment that is discarded after use.<ref name="Tee-12-158">Teele (2008), p. 12-158.</ref> They | Some ensembles are not meant to be decontaminated at all. NFPA 1994 ensembles for chemical, biological, radiological and nuclear (CBRN) terrorism incidents are intended as single-exposure equipment that is discarded after use.<ref name="Tee-12-158">Teele (2008), p. 12-158.</ref> They are intended for personnel exposed to victims or materials during assessment, rescue, decontamination, triage and treatment, and their classes consider the threat of contamination and cross-contamination.<ref name="Tee-12-158" /> The military calls such agents [[weapons of mass destruction]].<ref name="Tee-12-157" /> | ||
Fire stations need facilities for the same purpose. Acomb and LeBoeuf assume that station personnel, whether they provide [[fire-based emergency medical services|emergency medical care]] or hazardous materials response, will at some time meet a contamination problem requiring complete clothing removal.<ref name="AL-12-239">Acomb and LeBoeuf (2008), p. 12-239.</ref> A decontamination room or space must then let personnel remove their outer clothing and clean their skin without contaminating the rest of the station.<ref name="AL-12-239" /> Its equipment includes foot-activated hampers, motion- or foot-operated wash basins, automatic showers and doors, and spare clothes; a direct exterior entrance keeps contamination from spreading.<ref name="AL-12-239" /> Laundry rooms with commercial machines clean turnout gear, because few commercial laundries will wash it.<ref name="AL-12-240">Acomb and LeBoeuf (2008), p. 12-240.</ref> Under NFPA 1581, as described by Loflin, departments had to clean fire fighters' protective clothing at least every 6 months.<ref name="Lof-12-115" /> | Fire stations need facilities for the same purpose. Acomb and LeBoeuf assume that station personnel, whether they provide [[fire-based emergency medical services|emergency medical care]] or hazardous materials response, will at some time meet a contamination problem requiring complete clothing removal.<ref name="AL-12-239">Acomb and LeBoeuf (2008), p. 12-239.</ref> A decontamination room or space must then let personnel remove their outer clothing and clean their skin without contaminating the rest of the station.<ref name="AL-12-239" /> Its equipment includes foot-activated hampers, motion- or foot-operated wash basins, automatic showers and doors, and spare clothes; a direct exterior entrance keeps contamination from spreading.<ref name="AL-12-239" /> Laundry rooms with commercial machines clean turnout gear, because few commercial laundries will wash it.<ref name="AL-12-240">Acomb and LeBoeuf (2008), p. 12-240.</ref> Under NFPA 1581, as described by Loflin, departments had to clean fire fighters' protective clothing at least every 6 months.<ref name="Lof-12-115" /> | ||
| Line 56: | Line 58: | ||
A Dutch report on indoor car parks by Van der Graaf, Hessels and Rosmuller gives a fire service example from the Netherlands. Fires in electric vehicles release toxic gases ([[fire toxicity]]), among them hydrogen fluoride (HF).<ref name="VdG-26">Van der Graaf et al. (2021/2023), p. 26.</ref> Larsson and colleagues found that about 20 to 200 mg of HF is released per Wh of battery capacity.<ref name="Lars">Larsson et al. (2017), as cited in Van der Graaf et al. (2021/2023), p. 26.</ref> According to the report, a 100 kWh battery pack can emit 2 to 20 kg of HF, depending on its state of charge.<ref name="VdG-26" /> | A Dutch report on indoor car parks by Van der Graaf, Hessels and Rosmuller gives a fire service example from the Netherlands. Fires in electric vehicles release toxic gases ([[fire toxicity]]), among them hydrogen fluoride (HF).<ref name="VdG-26">Van der Graaf et al. (2021/2023), p. 26.</ref> Larsson and colleagues found that about 20 to 200 mg of HF is released per Wh of battery capacity.<ref name="Lars">Larsson et al. (2017), as cited in Van der Graaf et al. (2021/2023), p. 26.</ref> According to the report, a 100 kWh battery pack can emit 2 to 20 kg of HF, depending on its state of charge.<ref name="VdG-26" /> | ||
Because HF deposits on surfaces and smoke particles, firefighting clothing becomes more contaminated.<ref name="VdG-26" /> Citing the Dutch National Institute for Public Health and the Environment (RIVM), the report states that fighting such a fire requires the firefighters' clothing to be decontaminated, unlike a fire in a conventionally powered vehicle.<ref name="VdG-30" /> The report | Because HF deposits on surfaces and smoke particles, firefighting clothing becomes more contaminated.<ref name="VdG-26" /> Citing the Dutch National Institute for Public Health and the Environment (RIVM), the report states that fighting such a fire requires the firefighters' clothing to be decontaminated, unlike a fire in a conventionally powered vehicle.<ref name="VdG-30" /> The Dutch report states that contaminated cooling water from an immersion tank must not be discharged directly into the sewer.<ref name="VdG-47">Van der Graaf et al. (2021/2023), p. 47.</ref> | ||
== Limits and common misconceptions == | == Limits and common misconceptions == | ||
| Line 63: | Line 65: | ||
Decontamination is also distinct from clean-up of the site. In the FDNY plan, clean-up removed the hazardous material and all contaminated debris, including soil, water, containers, vehicles, tools and equipment.<ref name="LV-A-8.1">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §8.1.</ref> Clean-up was not a fire department function, although the department had to ensure that it took place.<ref name="LV-A-8.1" /> Decontamination, by contrast, deals with people and equipment leaving the contaminated zones.<ref name="LV-A-5.3" /> Its waste water is a further concern, which the FDNY plan addressed by having shower water analysed.<ref name="LV-A-5.3.2" /> | Decontamination is also distinct from clean-up of the site. In the FDNY plan, clean-up removed the hazardous material and all contaminated debris, including soil, water, containers, vehicles, tools and equipment.<ref name="LV-A-8.1">Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §8.1.</ref> Clean-up was not a fire department function, although the department had to ensure that it took place.<ref name="LV-A-8.1" /> Decontamination, by contrast, deals with people and equipment leaving the contaminated zones.<ref name="LV-A-5.3" /> Its waste water is a further concern, which the FDNY plan addressed by having shower water analysed.<ref name="LV-A-5.3.2" /> | ||
The sources describe US practice between 1994 and 2008 and, for electric vehicles, Dutch research published in 2021. The | The sources describe US practice between 1994 and 2008 and, for electric vehicles, Dutch research first published in 2021.<ref name="LV-A-3.3" /><ref name="Tee-12-158" /><ref name="VdG-30" /> The 1994 FDNY personnel sequence explicitly permits part of its steps to be used after a field analysis of the hazards and risks.<ref name="LV-A-5.3.2" /> The procedures in this article are examples of documented practice rather than universal requirements. | ||
== See also == | == See also == | ||
Revision as of 03:39, 8 November 2026
Decontamination, also called contamination reduction, is the removal or neutralisation of contaminants from people and equipment after a hazardous materials release, so that foreseeable adverse health effects do not occur outside the area of exposure.[1] In the response model of the Fire Protection Handbook (20th edition, 2008), a decontamination process is chosen for every response option.[2] It is carried out in the warm zone, between the contaminated hot zone and the clean cold zone.[3] Possible methods are absorption, adsorption, chemical degradation, dilution, neutralisation and solidification, tailored to the hazards of the incident.[1]
A New York City fire department plan of 1994 calls decontamination one of the most important steps in ensuring personal safety at a hazardous materials emergency.[4] Its personnel procedure includes showers and a medical check.[5] Decontamination also covers protective clothing, tools and apparatus.[1] Some contaminated garments cannot be decontaminated and must then be discarded.[6] The sources also describe decontamination after radioactive releases and, in a Dutch study, of firefighters' clothing after fires in electric vehicles.[7][8]
Definition and purpose
C. J. Wright defines decontamination, or contamination reduction, as the act of removing or neutralising contaminants from equipment or personnel to preclude foreseeable adverse health effects outside the engulfed area.[1] The engulfed area is the actual or potential area of exposure to a hazardous material.[9] The plan of the Fire Department of the City of New York (FDNY) gives a similar definition. Decontamination is the process of making personnel, equipment and supplies safe by reducing present levels of poisonous or otherwise harmful substances.[4]
The need arises because personnel, protective equipment, apparatus, tools and equipment may become contaminated at a hazardous materials incident.[1] Decontamination is part of the system that prevents or reduces the physical transfer of contaminants from the site by people and equipment.[5] The FDNY plan treats site control as two activities: the physical arrangement and control of the work areas, and the removal of contaminants from people and equipment.[10] The plan adds that the success of decontamination depends on the ability of the incident commander to keep control of personnel at the site.[4]
Two related terms appear in the sources. NFPA 473 separates two levels of emergency medical responders according to whether their patients still pose a significant risk of secondary contamination.[11] Loflin describes cross-contamination by protective clothing. Clothing worn at an incident scene can contain harmful contaminants, and the possibility of such cross-contamination is real.[12]
Place in the hazardous materials response
In the hazardous materials response model described by Wright, decontamination appears in planning, implementation and evaluation. During planning, responders identify an appropriate decontamination process for each response option, alongside its protective equipment.[2] Materials for decontamination are among the resources counted when an option is selected, and decontamination procedures form one of the ten components of the plan of action.[13] During implementation, decontamination is set up together with the control zones as part of scene control.[3] The final duty, evaluating progress, includes a check on how well the decontamination process is working.[14]
In the United States, the Hazardous Waste Operations and Emergency Response (HAZWOPER) rule in the Code of Federal Regulations (29 CFR 1910.120) links decontamination to each responder level. First responders at the operations level must know how to implement basic decontamination measures, and technicians must understand and implement decontamination procedures.[15] Specialists must be able to determine and implement them, and the on-scene incident commander must know and understand their importance.[16] NFPA 471, the recommended practice for responding to hazardous materials incidents, also covers decontamination.[17] An industrial fire brigade that acts as a hazmat team must have specific personnel decontamination procedures so that team members can safely leave a contaminated area.[18]
Within an incident command system, decontamination can be organised as a functional unit. The FDNY glossary of 1991 names a decon group as an example of a group, an organisational level with a specified functional assignment under a group supervisor.[19] In the 1994 plan, a decontamination team of at least two members of the Hazardous Materials Unit managed the control zones and access control points.[20] The same team set up the decontamination area, decontaminated the hazardous materials team and overpacked exposed equipment for further treatment or disposal.[20] A decontamination officer of the Special Operations Command was responsible for on-site and off-site decontamination, and determined the procedure together with the city's Department of Environmental Protection.[21]
Methods and selection of a process
Wright names six possible decontamination options: absorption, adsorption, chemical degradation, dilution, neutralisation and solidification.[1] Procedures should be tailored to the specific hazards of the incident, and may vary in complexity and number of steps with the level of hazard and of exposure.[1] The FDNY plan gives two extremes. An uncontaminated light oil with minimal hazard can be partially removed by flushing it from protective clothing, whereas a poisonous material requires a careful and detailed course of action.[4]
Wright lists four steps for selecting a process. The first is to identify what needs decontamination: injured persons, response personnel, protective equipment, other equipment and emergency-care facilities.[1] The second is to determine the contaminant and the type and amount of contamination.[13] Relevant questions are whether the material is organic or inorganic, solid, liquid or gas, a skin or inhalation hazard, and local or systemic in its effect.[13] Responders also judge whether it is life threatening, injurious or irritating, and whether physical trauma is involved.[13]
The third step is to seek advice. Immediate decontamination guidance is found in the first-aid sections of the numbered guide pages of the Emergency Response Guidebook.[13] Other immediate sources are the pocket guide to chemical hazards of the National Institute of Occupational Safety and Health (NIOSH) and local planning documents.[13] Follow-up guidance can come from poison control centres, from the shipper or manufacturer through CHEMTREC, and from the Agency for Toxic Substances and Disease Registry.[13] The fourth step is to identify how clothing and equipment that cannot be decontaminated will be isolated, secured and disposed of.[13]
Water was the usual medium in the FDNY procedure, but not always. Members showered for a period set by the substance involved, except where the substance is made more active by water.[22] The steps were designed for worst-case incidents, and the decision to apply all or part of them was to rest on a field analysis of the hazards and risks.[22] The toxicological and reactivity information that decided which techniques applied came from the Hazardous Materials Unit and the city departments of health and environmental protection.[22]
The decontamination corridor
Decontamination takes place in the warm zone, the area between the hot zone around the release and the cold zone with the command post.[3] Wright's diagram of control zones shows a decontamination corridor crossing the warm zone, with access control points on the hot line and on the contamination control line.[14] The FDNY plan called this zone the contamination reduction area and stated that all decontamination activities occur there.[23] Its purpose is to prevent or reduce the transfer of contaminants picked up by personnel or equipment returning from the exclusion area, the plan's term for the hot zone.[23]
Two lines bound the corridor. The hot line separates the exclusion area from the contamination reduction area, and a decontamination station for personnel or equipment is set up close to it.[23] The contamination control line separates the possibly contaminated area from the clean zone. Leaving the contamination reduction area for the clean area requires removal of suspected or known contaminated clothing and equipment.[23] Unless otherwise demonstrated, everything leaving the exclusion area should be considered contaminated.[24] Potentially contaminated clothing and equipment are not permitted in the support area, where normal fire-fighting clothing is worn.[25]
The FDNY plan based its three-zone system and exacting decontamination procedures on a worst-case situation.[26] Less stringent site control and decontamination could be used once air monitoring, instrument surveys and technical data gave more accurate information about the contaminants.[26] A hazardous materials incident safety officer should ensure that hot, warm, decontamination and other zone designations are clearly marked and communicated to all members.[27] People working in the corridor face their own exposure: Wright lists splashes during the decontamination of people or equipment among the exposure types to consider when selecting protective equipment.[28]
Personnel decontamination: the New York City procedure of 1994
The FDNY plan, reproduced by the National Institute of Standards and Technology (NIST) in its report on the World Trade Center emergency response, sets out a complete personnel procedure. FDNY kept a Hazardous Materials Decontamination Unit consisting of a decontamination trailer and a support unit, and the police department had a similar unit as backup.[29] Elsewhere in the United States, some departments acquired mobile decontamination trailers as part of domestic preparedness work.[30] The procedure applied to anything leaving the exclusion and contamination reduction areas, including personnel, protective equipment, monitoring equipment and clean-up equipment.[5]
The procedure had nine steps. An entry point was marked to guide contaminated personnel into the area, and protective clothing was removed and isolated in sealed plastic bags placed in recovery drums.[22] Members then entered the rear of the unit under the supervision of emergency medical service (EMS) personnel, removed personal effects and work clothing, and showered.[22] After showering they received towels and clothing and left the unit.[22] EMS personnel then took a medical history, checked vital signs and followed up complaints, usually in a medical vehicle on the clean side, and transported members who needed further care.[22] Finally, the unit was disconnected, and the Department of Environmental Protection analysed the shower waste water.[22]
The plan also tracked people and equipment. The Safety Operating Battalion Chief normally confirmed that all exposed members took part in the decontamination procedure; if that officer did not attend, the Special Operations Decon Officer performed this function. The Safety Chief recorded members' names and units with a description of the procedures used.[31] Apparatus, tools, clothing and personal items stayed at the site until a member of the Special Operations Command had decided what needed decontamination.[32]
Potentially contaminated breathing-air cylinders were not to be exchanged.[33] Decontamination was done at the scene where possible, so that apparatus and equipment could return to service; otherwise the decontamination officer set a time and site.[21] The plan required the incident commander to review actions after each hazardous materials operation.[34]
Protective clothing, equipment and fire stations
Protective clothing is both a barrier against contamination and a possible carrier of it. Teele notes that decontamination may not be possible when protective garments are contaminated with chemical, radiological or biological agents. Such garments should then be discarded in line with local, state and federal regulations.[6] Chlorine bleach must not be used for any cleaning, decontamination or disinfection of protective equipment, because some components lose their physical integrity or flame resistance.[6] For chemical protective clothing certified to NFPA 1991 or NFPA 1992, the manufacturer's technical data should include decontamination procedures.[35] Where a suit allows a choice, wearing the breathing apparatus inside the ensemble is strongly recommended, partly to reduce decontamination problems.[35]
Some ensembles are not meant to be decontaminated at all. NFPA 1994 ensembles for chemical, biological, radiological and nuclear (CBRN) terrorism incidents are intended as single-exposure equipment that is discarded after use.[36] They are intended for personnel exposed to victims or materials during assessment, rescue, decontamination, triage and treatment, and their classes consider the threat of contamination and cross-contamination.[36] The military calls such agents weapons of mass destruction.[35]
Fire stations need facilities for the same purpose. Acomb and LeBoeuf assume that station personnel, whether they provide emergency medical care or hazardous materials response, will at some time meet a contamination problem requiring complete clothing removal.[37] A decontamination room or space must then let personnel remove their outer clothing and clean their skin without contaminating the rest of the station.[37] Its equipment includes foot-activated hampers, motion- or foot-operated wash basins, automatic showers and doors, and spare clothes; a direct exterior entrance keeps contamination from spreading.[37] Laundry rooms with commercial machines clean turnout gear, because few commercial laundries will wash it.[38] Under NFPA 1581, as described by Loflin, departments had to clean fire fighters' protective clothing at least every 6 months.[12]
Patients, hospitals and wider contamination
Contaminated victims add a medical dimension. Wright warns that extreme caution is necessary when giving emergency medical care to victims of hazardous material incidents.[14] Under NFPA 473, Level I personnel treat in the cold zone only patients who no longer pose a significant risk of secondary contamination.[11] Level II personnel work in the warm zone and may treat patients who still pose such a risk.[11] The FDNY plan required people exposed before a hazardous substance was recognised to be isolated, to avoid spreading contamination and to allow medical treatment and monitoring.[5]
Victims who leave the scene on their own create a separate problem. For mass casualty incidents, Teele notes that civilian victims may arrive at medical facilities without having been decontaminated at the scene, so medical first receivers should have protective equipment.[39] Contamination can also be costly. Whitford reports that, after a pesticide release, the decontamination of ambulances and hospital rooms can reach thousands of dollars.[40]
Decontamination also extends to buildings. Where radioactive materials are involved, Davenport calls the need to decontaminate buildings, equipment and materials a serious and complicated problem.[7] Holmes notes that this necessity can delay salvage and the resumption of normal operations.[41] For nuclear facilities, he advises emergency plans that prevent the spread of contamination and promptly decontaminate the area after a release.[41] A nuclear reactor site needs a generous water supply for fire control and decontamination, and prearranged disposal or storage of contaminated water.[41] Severson adds that extensive decontamination may become necessary if combustion products of long-lived radioactive waste spread through air-conditioning or compressed-air systems.[42]
A Dutch report on indoor car parks by Van der Graaf, Hessels and Rosmuller gives a fire service example from the Netherlands. Fires in electric vehicles release toxic gases (fire toxicity), among them hydrogen fluoride (HF).[43] Larsson and colleagues found that about 20 to 200 mg of HF is released per Wh of battery capacity.[44] According to the report, a 100 kWh battery pack can emit 2 to 20 kg of HF, depending on its state of charge.[43]
Because HF deposits on surfaces and smoke particles, firefighting clothing becomes more contaminated.[43] Citing the Dutch National Institute for Public Health and the Environment (RIVM), the report states that fighting such a fire requires the firefighters' clothing to be decontaminated, unlike a fire in a conventionally powered vehicle.[8] The Dutch report states that contaminated cooling water from an immersion tank must not be discharged directly into the sewer.[45]
Limits and common misconceptions
Decontamination is not always possible or complete. Some garments cannot be decontaminated and must be discarded, and some ensembles are designed to be thrown away after a single exposure.[6][36] Water, the usual medium for showers and flushing, can be the wrong choice for substances made more active by water.[22] Wright's selection process includes, as a separate step, plans for isolating, securing and disposing of clothing and equipment that cannot be decontaminated.[13]
Decontamination is also distinct from clean-up of the site. In the FDNY plan, clean-up removed the hazardous material and all contaminated debris, including soil, water, containers, vehicles, tools and equipment.[46] Clean-up was not a fire department function, although the department had to ensure that it took place.[46] Decontamination, by contrast, deals with people and equipment leaving the contaminated zones.[5] Its waste water is a further concern, which the FDNY plan addressed by having shower water analysed.[22]
The sources describe US practice between 1994 and 2008 and, for electric vehicles, Dutch research first published in 2021.[4][36][8] The 1994 FDNY personnel sequence explicitly permits part of its steps to be used after a field analysis of the hazards and risks.[22] The procedures in this article are examples of documented practice rather than universal requirements.
See also
- Fire station design
- Emergency Response Guidebook
- Structural firefighting protective clothing
- Self-contained breathing apparatus
- Incident safety officer
Notes
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 C. J. Wright (2008a), p. 13-140.
- ↑ 2.0 2.1 C. J. Wright (2008a), p. 13-137.
- ↑ 3.0 3.1 3.2 C. J. Wright (2008a), p. 13-142.
- ↑ 4.0 4.1 4.2 4.3 4.4 Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §3.3.
- ↑ 5.0 5.1 5.2 5.3 5.4 Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.3.
- ↑ 6.0 6.1 6.2 6.3 Teele (2008), p. 12-146.
- ↑ 7.0 7.1 Davenport (2008), p. 7-53.
- ↑ 8.0 8.1 8.2 Van der Graaf et al. (2021/2023), p. 30.
- ↑ C. J. Wright (2008a), p. 13-134.
- ↑ Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §3.2.
- ↑ 11.0 11.1 11.2 Hildebrand and Noll (2008), p. 13-96.
- ↑ 12.0 12.1 Loflin (2008), p. 12-115.
- ↑ 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8 C. J. Wright (2008a), p. 13-141.
- ↑ 14.0 14.1 14.2 C. J. Wright (2008a), p. 13-143.
- ↑ Hildebrand and Noll (2008), p. 13-89.
- ↑ Hildebrand and Noll (2008), p. 13-90.
- ↑ Hildebrand and Noll (2008), p. 13-95.
- ↑ Snyder (2008), p. 12-197.
- ↑ Lawson and Vettori (2005), Appendix A, FDNY ICS glossary, "Group".
- ↑ 20.0 20.1 Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §4.3.4.
- ↑ 21.0 21.1 Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §4.3.6.
- ↑ 22.00 22.01 22.02 22.03 22.04 22.05 22.06 22.07 22.08 22.09 22.10 Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.3.2.
- ↑ 23.0 23.1 23.2 23.3 Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.2.
- ↑ Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.1.
- ↑ Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.3.
- ↑ 26.0 26.1 Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.2.5.
- ↑ Loflin (2008), p. 12-112.
- ↑ C. J. Wright (2008a), p. 13-139.
- ↑ Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.3.1.
- ↑ Denlinger (2008), p. 12-64.
- ↑ Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §6.1.
- ↑ Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §5.3.3.
- ↑ Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §6.6.
- ↑ Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §9.1.
- ↑ 35.0 35.1 35.2 Teele (2008), p. 12-157.
- ↑ 36.0 36.1 36.2 36.3 Teele (2008), p. 12-158.
- ↑ 37.0 37.1 37.2 Acomb and LeBoeuf (2008), p. 12-239.
- ↑ Acomb and LeBoeuf (2008), p. 12-240.
- ↑ Teele (2008), p. 12-156.
- ↑ Whitford (2008), p. 6-234.
- ↑ 41.0 41.1 41.2 Holmes (2008a), p. 9-199.
- ↑ Severson (2008), p. 7-67.
- ↑ 43.0 43.1 43.2 Van der Graaf et al. (2021/2023), p. 26.
- ↑ Larsson et al. (2017), as cited in Van der Graaf et al. (2021/2023), p. 26.
- ↑ Van der Graaf et al. (2021/2023), p. 47.
- ↑ 46.0 46.1 Lawson and Vettori (2005), Appendix A, FDNY hazardous materials plan, §8.1.
References
- Acomb, D. J., & LeBoeuf, R. M. (2008). Fire rescue stations and fire service training centers. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-233–12-251). National Fire Protection Association.
- Davenport, J. A. (2008). Storage and handling of chemicals. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 7-43–7-55). National Fire Protection Association.
- Denlinger, R. F. (2008). Managing fire-rescue departments. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-51–12-78). National Fire Protection Association.
- Hildebrand, M. S., & Noll, G. G. (2008). Public fire protection and hazmat management. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 13-81–13-98). National Fire Protection Association.
- Holmes, W. D. (2008a). Nuclear facilities. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 9-191–9-201). National Fire Protection Association.
- Lawson, J. R., & Vettori, R. L. (2005). The emergency response operations (NIST NCSTAR 1-8). National Institute of Standards and Technology.
- Loflin, M. E. (2008). Safety, medical, and health issues and programs. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-107–12-125). National Fire Protection Association.
- Severson, P. R. (2008). Hazardous waste control. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 7-57–7-69). National Fire Protection Association.
- Snyder, M. (2008). Industrial fire loss prevention. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-177–12-198). National Fire Protection Association.
- Teele, B. W. (2008). Fire and emergency services protective clothing and protective equipment. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-143–12-160). National Fire Protection Association.
- Van der Graaf, J., Hessels, T., & Rosmuller, N. (2023). Fire safety of indoor car parks accommodating electrically powered vehicles. Nederlands Instituut Publieke Veiligheid. (Original work published 2021)
- Whitford, F. (2008). Pesticides in the workplace. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 6-233–6-245). National Fire Protection Association.
- Wright, C. J. (2008a). Managing the response to hazardous material incidents. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 13-117–13-144). National Fire Protection Association.