'''Fire station design''' is the planning, siting and layout of the building that houses a fire department's vehicles, equipment and crews and from which those crews respond to emergencies. In US practice as described by Acomb and LeBoeuf (2008), a station ranges from a single apparatus bay with a desk at the back to a multiple-company building with a full administrative function.<ref name="AL-12-233">Acomb and LeBoeuf (2008), p. 12-233.</ref> Because no single solution suits every community, they describe a process of needs assessment, planning, design and construction carried out with knowledgeable architects and engineers.<ref name="AL-12-233" />
'''Fire station design''' is the planning, siting and layout of the building that houses a fire department's vehicles, equipment and crews and from which those crews respond to emergencies. In US practice as described by Acomb and LeBoeuf (2008), a station ranges from a single apparatus bay with a desk at the back to a multiple-company building with a full administrative function.<ref name="AL-12-233">Acomb and LeBoeuf (2008), p. 12-233.</ref> Because no single solution suits every community, they describe a process of needs assessment, planning, design and construction carried out with knowledgeable architects and engineers.<ref name="AL-12-233" />


The building has to bring crews to their vehicles quickly, house crews who are on duty at all times, and provide for the cleaning of equipment and protective clothing.<ref name="AL-12-236">Acomb and LeBoeuf (2008), p. 12-236.</ref><ref name="AL-12-238">Acomb and LeBoeuf (2008), p. 12-238.</ref><ref name="AL-12-240">Acomb and LeBoeuf (2008), p. 12-240.</ref> Typical spaces are the apparatus bay, sleeping accommodation, a watch room, a kitchen, a lounge and a decontamination room or space. The handbook names safety, functionality, durability and ease of maintenance as the primary design issues.<ref name="AL-12-251">Acomb and LeBoeuf (2008), p. 12-251.</ref> The guidance summarised here describes the United States in the years before 2008. It is offered as ideas and rules of thumb rather than as an exhaustive set of requirements.<ref name="AL-12-233" />
The layout should bring crews to their vehicles quickly and provide for the cleaning of equipment and protective clothing. Stations staffed around the clock also need living and sleeping accommodation.<ref name="AL-12-236">Acomb and LeBoeuf (2008), p. 12-236.</ref><ref name="AL-12-238">Acomb and LeBoeuf (2008), p. 12-238.</ref><ref name="AL-12-240">Acomb and LeBoeuf (2008), p. 12-240.</ref> Other spaces described in the handbook include a watch room, kitchen, lounge and decontamination room or space. The handbook names safety, functionality, durability and ease of maintenance as the primary design issues.<ref name="AL-12-251">Acomb and LeBoeuf (2008), p. 12-251.</ref> The guidance summarised here describes the United States in the years before 2008. It is offered as ideas and rules of thumb rather than as an exhaustive set of requirements.<ref name="AL-12-233" />


== Role of the fire station ==
== Role of the fire station ==
Emergency services are usually delivered through a decentralised system of fire stations, strategically located throughout a community. Each station houses engine, ladder, rescue and other companies as local needs demand and resources permit.<ref name="Denlinger-12-51">Denlinger (2008), p. 12-51.</ref> The company, a group of personnel operating one or more pieces of apparatus under a company officer, is the basic tactical unit. Several companies may operate from one station, and in most cases at least one engine company is based at each station.<ref name="Denlinger-12-63">Denlinger (2008), p. 12-63.</ref> In larger departments, companies are organised into battalions or districts, as described under [[fire department organisation]].<ref name="Denlinger-12-63" /> In 2005 the 30,500 local fire departments of the United States had 48,400 fire stations.<ref name="HallCote-3-27">Hall and Cote (2008), p. 3-27.</ref>
Emergency services are usually delivered through a decentralised system of fire stations, strategically located throughout a community. Each station houses engine, ladder, rescue and other companies as local needs demand and resources permit.<ref name="Denlinger-12-51">Denlinger (2008), p. 12-51.</ref> The company, a group of personnel operating one or more pieces of apparatus under a company officer, is the basic tactical unit. Several companies may operate from one station, and in most cases at least one engine company is based at each station.<ref name="Denlinger-12-63">Denlinger (2008), p. 12-63.</ref> In larger departments, companies are organised into battalions or districts, as described under [[fire department organisation]].<ref name="Denlinger-12-63" /> In 2005 the 30,500 local fire departments of the United States had 48,400 fire stations.<ref name="HallCote-3-27">Hall and Cote (2008), p. 3-27.</ref>


The station is also the starting point of every response. Johnson and Price (2008) divide the total reflex time after an alarm into dispatch time, turnout time, response (travel) time, access time and setup time.<ref name="JP-12-218">Johnson and Price (2008), p. 12-218.</ref> Turnout time runs from the moment units acknowledge the alarm to the start of travel. It can be managed partly by improving communication between the dispatch centre and the station.<ref name="JP-12-218" />
For station-based companies, the station is the starting point of the apparatus response; some volunteers instead travel directly to the incident.<ref name="Denlinger-12-74">Denlinger (2008), p. 12-74.</ref> Johnson and Price (2008) divide the total reflex time after an alarm into dispatch time, turnout time, response (travel) time, access time and setup time.<ref name="JP-12-218">Johnson and Price (2008), p. 12-218.</ref> Turnout time runs from the moment units acknowledge the alarm to the start of travel. It can be managed partly by improving communication between the dispatch centre and the station.<ref name="JP-12-218" />


NFPA 1710, as described by Johnson and Price (2008), sets a turnout time objective of one minute (60 s) for career departments.<ref name="JP-12-220">Johnson and Price (2008), p. 12-220.</ref> For call and volunteer departments the turnout time is typically greater.<ref name="JP-12-222">Johnson and Price (2008), p. 12-222.</ref> On an alarm, members of many volunteer departments report to an assigned station and respond from there with the apparatus.<ref name="Denlinger-12-74">Denlinger (2008), p. 12-74.</ref>
NFPA 1710, as described by Johnson and Price (2008), sets a turnout time objective of one minute (60 s) for career departments.<ref name="JP-12-220">Johnson and Price (2008), p. 12-220.</ref> For call and volunteer departments the turnout time is typically greater.<ref name="JP-12-222">Johnson and Price (2008), p. 12-222.</ref> On an alarm, members of many volunteer departments report to an assigned station and respond from there with the apparatus.<ref name="Denlinger-12-74">Denlinger (2008), p. 12-74.</ref>


Fire engineers treat the stations around a building as an input to their analysis. The ''International Fire Engineering Guidelines'' (IFEG) define dispatch time as the time from notification of the alarm until the fire service vehicles leave the station. A station with full-time paid fire fighters is likely to respond faster than one operated by volunteers.<ref name="IFEG-1.9-2">National Research Council of Canada et al. (2005), p. 1.9-2.</ref> The number and location of stations, the resources they contain and the time to dispatch those resources are among the principal factors governing fire service capability for [[firefighting]].<ref name="IFEG-1.9-5">National Research Council of Canada et al. (2005), p. 1.9-5.</ref> This capability may change over the life of a building as station locations, budgets, equipment and traffic change.<ref name="IFEG-1.9-2" />
The ''International Fire Engineering Guidelines'' (IFEG) define dispatch time as the time from notification of the alarm until the fire service vehicles leave the station. A station with full-time paid fire fighters is likely to respond faster than one operated by volunteers.<ref name="IFEG-1.9-2">National Research Council of Canada et al. (2005), p. 1.9-2.</ref> The number and location of stations, the resources they contain and the time to dispatch those resources are among the principal factors governing fire service capability for [[firefighting]].<ref name="IFEG-1.9-5">National Research Council of Canada et al. (2005), p. 1.9-5.</ref> This capability may change over the life of a building as station locations, budgets, equipment and traffic change.<ref name="IFEG-1.9-2" />


Denlinger (2008) describes the neighbourhood station as a possible key delivery point for fire prevention, with station crews delivering community programmes.<ref name="Denlinger-12-57">Denlinger (2008), p. 12-57.</ref> Lawson and Vettori (2005), studying the response to the World Trade Center attack of 2001, note that accountability in career departments typically begins at the station. Fire fighters on a shift are checked in by an officer, and a riding list of personnel and job assignments is prepared for each company.<ref name="LV-55">Lawson and Vettori (2005), p. 55.</ref>
Denlinger (2008) describes the neighbourhood station as a possible key delivery point for fire prevention, with station crews delivering community programmes.<ref name="Denlinger-12-57">Denlinger (2008), p. 12-57.</ref> Lawson and Vettori (2005), studying the response to the World Trade Center attack of 2001, note that accountability in career departments typically begins at the station. Fire fighters on a shift are checked in by an officer, and a riding list of personnel and job assignments is prepared for each company.<ref name="LV-55">Lawson and Vettori (2005), p. 55.</ref>
Line 26: Line 26:
Stations on major routes may seem efficient, but they remove expensive land from the tax base. An alternative is a site just off the major route, with a signalised intersection giving safe access to it.<ref name="AL-12-234" /> This improves emergency egress and reduces vehicle accidents and traffic stacking. It was becoming more popular in 2008, helped by technology that lets apparatus control intersection signals.<ref name="AL-12-235" /> Johnson and Price (2008) add that apparatus must enter the street safely and return without disrupting traffic, so a side street may be preferable. At volunteer stations, apparatus may be leaving while members are still arriving.<ref name="JP-12-228">Johnson and Price (2008), p. 12-228.</ref>
Stations on major routes may seem efficient, but they remove expensive land from the tax base. An alternative is a site just off the major route, with a signalised intersection giving safe access to it.<ref name="AL-12-234" /> This improves emergency egress and reduces vehicle accidents and traffic stacking. It was becoming more popular in 2008, helped by technology that lets apparatus control intersection signals.<ref name="AL-12-235" /> Johnson and Price (2008) add that apparatus must enter the street safely and return without disrupting traffic, so a side street may be preferable. At volunteer stations, apparatus may be leaving while members are still arriving.<ref name="JP-12-228">Johnson and Price (2008), p. 12-228.</ref>


Acomb and LeBoeuf (2008) list rules of thumb for the site. The exit curb cut should be at least 30.4 m (100 ft) from an intersection, and the apparatus apron at least 18.2 m (60 ft) long from the street to the bay doors.<ref name="AL-12-235" /> The apron should slope no more than 2 percent, and the road should be at least 7.315 m (24 ft) wide. Sites at the bottom of a hill, or behind barriers such as railway tracks, one-way streets and flood-prone bridges, should be avoided.<ref name="AL-12-235" /> For parking, a rule of thumb is two spaces for each member on a shift, to cover the shift change, plus spaces for other staff and the public.<ref name="AL-12-235" />
Acomb and LeBoeuf (2008) list rules of thumb for the site. The exit curb cut should be at least 30.4 m (100 ft) from an intersection, and the apparatus apron at least 18.2 m (60 ft) long from the street right-of-way to the bay doors.<ref name="AL-12-235" /> The apron should slope no more than 2 percent, and the road should be at least 7.315 m (24 ft) wide. Sites at the bottom of a hill, or behind barriers such as railway tracks, one-way streets and flood-prone bridges, should be avoided.<ref name="AL-12-235" /> For parking, a rule of thumb is two spaces for each member on a shift, to cover the shift change, plus spaces for other staff and the public.<ref name="AL-12-235" />


A site also needs environmental, geotechnical and archaeological due diligence.<ref name="AL-12-235" /> Many US state building codes define fire stations as essential facilities and require a soil investigation for the permit.<ref name="AL-12-235" /> Johnson and Price (2008) add terrain and flood risk, which geographic information systems can map with soils, earthquake faults and slopes. The size of the building, the number of personnel and any training area dictate the size of the site.<ref name="JP-12-228" />
A site also needs environmental, geotechnical and archaeological due diligence.<ref name="AL-12-235" /> Many US state building codes define fire stations as essential facilities and require a soil investigation for the permit.<ref name="AL-12-235" /> Johnson and Price (2008) add terrain and flood risk, which geographic information systems can map with soils, earthquake faults and slopes. The size of the building, the number of personnel and any training area dictate the size of the site.<ref name="JP-12-228" />
Line 74: Line 74:
Design practice in 2008 was to build a single-storey station where the site allowed. Sliding poles were described as a rapidly diminishing tradition because of injuries, and a stairway was considered far safer.<ref name="AL-12-236" /> In a two-storey station, administration can go upstairs while response functions, including sleeping, stay on the ground floor. One-storey stations are typically cheaper, mainly because two storeys require a lift and vertical circulation.<ref name="AL-12-236" /> Injuries have occurred on both poles and stairs between sleeping area and bays, so the authors prefer the sleeping area on the same level as the bays, which also gives a faster response.<ref name="AL-12-238" />
Design practice in 2008 was to build a single-storey station where the site allowed. Sliding poles were described as a rapidly diminishing tradition because of injuries, and a stairway was considered far safer.<ref name="AL-12-236" /> In a two-storey station, administration can go upstairs while response functions, including sleeping, stay on the ground floor. One-storey stations are typically cheaper, mainly because two storeys require a lift and vertical circulation.<ref name="AL-12-236" /> Injuries have occurred on both poles and stairs between sleeping area and bays, so the authors prefer the sleeping area on the same level as the bays, which also gives a faster response.<ref name="AL-12-238" />


In the United States, fire stations are public facilities under the Americans with Disabilities Act (ADA category Type II) and must meet its accessibility standards. This federal law requires lifts in multistorey stations, and local waivers are not recognised in court.<ref name="AL-12-236-237">Acomb and LeBoeuf (2008), pp. 12-236–12-237.</ref> Sustainable design was gaining acceptance, formalised in the LEED (Leadership in Energy and Environmental Design) rating system.<ref name="AL-12-237" />
Acomb and LeBoeuf (2008) describe US fire stations as public facilities subject to accessibility standards under the Americans with Disabilities Act. In their account, multistorey stations require lifts and local waivers are not recognised in court.<ref name="AL-12-236-237">Acomb and LeBoeuf (2008), pp. 12-236–12-237.</ref> Sustainable design was gaining acceptance, formalised in the LEED (Leadership in Energy and Environmental Design) rating system.<ref name="AL-12-237" />


== Apparatus bay ==
== Apparatus bay ==
Line 81: Line 81:
The bay must fit the [[fire apparatus]] the department expects to own, and the needs assessment asks about apparatus size now and in the future.<ref name="AL-12-234" /> Tutterow (2008) notes that a mid-mount aerial ladder has a lower overall height when nested, which matters for older stations with low door openings.<ref name="Tutterow-12-276">Tutterow (2008), p. 12-276.</ref> He also calls it critical to keep apparatus batteries charged in the station, with an onboard charger or a polarised plug for an external charger.<ref name="Tutterow-12-273">Tutterow (2008), p. 12-273.</ref>
The bay must fit the [[fire apparatus]] the department expects to own, and the needs assessment asks about apparatus size now and in the future.<ref name="AL-12-234" /> Tutterow (2008) notes that a mid-mount aerial ladder has a lower overall height when nested, which matters for older stations with low door openings.<ref name="Tutterow-12-276">Tutterow (2008), p. 12-276.</ref> He also calls it critical to keep apparatus batteries charged in the station, with an onboard charger or a polarised plug for an external charger.<ref name="Tutterow-12-273">Tutterow (2008), p. 12-273.</ref>


Diesel engines make up almost all engines in new apparatus, and Tutterow (2008) states that diesel exhaust is a carcinogen that must be removed from stations.<ref name="Tutterow-12-269">Tutterow (2008), p. 12-269.</ref> He lists three ways: source capture with a hose on the exhaust pipe, an air handling and filtration unit in the bay, and an on-board system.<ref name="Tutterow-12-269-270">Tutterow (2008), pp. 12-269–12-270.</ref> Changing all the air in the bay whenever apparatus start or return is undesirable where the air is heated or cooled, because a large volume of new air must then be conditioned.<ref name="AL-12-236" /> Kitchen and dining areas should be separated from the bay to prevent diesel contamination.<ref name="AL-12-239">Acomb and LeBoeuf (2008), p. 12-239.</ref> A second national needs assessment, published in 2006, estimated that 72 percent of US fire stations were not equipped for exhaust emission control.<ref name="Jenaway-12-42">Jenaway (2008), p. 12-42.</ref><ref name="Jenaway-12-50">Jenaway (2008), p. 12-50.</ref>
Tutterow (2008) states that diesel engines made up almost all engines in newly manufactured apparatus at the time, and that diesel exhaust is a carcinogen that must be removed from stations.<ref name="Tutterow-12-269">Tutterow (2008), p. 12-269.</ref> He lists three ways: source capture with a hose on the exhaust pipe, an air handling and filtration unit in the bay, and an on-board system.<ref name="Tutterow-12-269-270">Tutterow (2008), pp. 12-269–12-270.</ref> Changing all the air in the bay whenever apparatus start or return is undesirable where the air is heated or cooled, because a large volume of new air must then be conditioned.<ref name="AL-12-236" /> Kitchen and dining areas should be separated from the bay to prevent diesel contamination.<ref name="AL-12-239">Acomb and LeBoeuf (2008), p. 12-239.</ref> A second national needs assessment, published in 2006, estimated that 72 percent of US fire stations were not equipped for exhaust emission control.<ref name="Jenaway-12-42">Jenaway (2008), p. 12-42.</ref><ref name="Jenaway-12-50">Jenaway (2008), p. 12-50.</ref>


The watch room, also called the alarm room or station office, is the office of the apparatus floor. It ranges from a minimum of 11 m² (120 ft²) with a desk, telephone, map and radio to a room for six or more people.<ref name="AL-12-238" /> It handles paperwork, the logging of calls and station-to-apparatus communication, and it usually overlooks the bays and apron.<ref name="AL-12-238" /> Some departments keep a 24-hour watch at a console in each station to receive dispatch messages and control the alerting devices; others rely on the communications centre to operate them. Controls for lights, electrically operated doors and traffic-control devices are usually at the watch desk.<ref name="Denlinger-12-67">Denlinger (2008), p. 12-67.</ref>
The watch room, also called the alarm room or station office, is the office of the apparatus floor. It ranges from a minimum of 11 m² (120 ft²) with a desk, telephone, map and radio to a room for six or more people.<ref name="AL-12-238" /> It handles paperwork, the logging of calls and station-to-apparatus communication, and it usually overlooks the bays and apron.<ref name="AL-12-238" /> Some departments keep a 24-hour watch at a console in each station to receive dispatch messages and control the alerting devices; others rely on the communications centre to operate them. Controls for lights, electrically operated doors and traffic-control devices are usually at the watch desk.<ref name="Denlinger-12-67">Denlinger (2008), p. 12-67.</ref>
Line 92: Line 92:
Where every person assigned to a station has clothing storage, this can mean three or four storage areas for each on-duty person.<ref name="AL-12-238" /> The kitchen of a staffed station is in almost constant use, which calls for a cooking area of commercial quality. A station with two or three full companies and a chief can be called on to serve upwards of 60 meals a day.<ref name="AL-12-239" /> A fitness room is sized from its equipment and clearances and needs a corridor at least 0.914 m (3 ft) wide for quick exit.<ref name="AL-12-239" />
Where every person assigned to a station has clothing storage, this can mean three or four storage areas for each on-duty person.<ref name="AL-12-238" /> The kitchen of a staffed station is in almost constant use, which calls for a cooking area of commercial quality. A station with two or three full companies and a chief can be called on to serve upwards of 60 meals a day.<ref name="AL-12-239" /> A fitness room is sized from its equipment and clearances and needs a corridor at least 0.914 m (3 ft) wide for quick exit.<ref name="AL-12-239" />


Stations with an administrative role can need offices for the chief, the fire prevention officer, who reviews oversized plans, and training staff.<ref name="AL-12-237" /> A separate training room should be set up as a classroom.<ref name="AL-12-238" /> Laughlin (2008) notes that training in a working station suffers from distractions such as visitors and the station telephone, and that classroom teaching in an open engine room is difficult.<ref name="Laughlin-12-167-168">Laughlin (2008), pp. 12-167–12-168.</ref> Structures for [[live fire training]], known as burn buildings, are usually provided at fire training centres, whose design draws on NFPA 1402 and NFPA 1403. Such centres can incorporate a working fire station.<ref name="AL-12-240" /><ref name="AL-12-245">Acomb and LeBoeuf (2008), p. 12-245.</ref><ref name="AL-12-247">Acomb and LeBoeuf (2008), p. 12-247.</ref> A small examination room near the entrance, for walk-up emergency cases and blood pressure screening, was described in 2008 as a recent addition.<ref name="AL-12-238" />
Stations with an administrative role can need offices for the chief, the fire prevention officer, who reviews oversized plans, and training staff.<ref name="AL-12-237" /> A separate training room should be set up as a classroom.<ref name="AL-12-238" /> Laughlin (2008) notes that training in a working station suffers from distractions such as visitors and the station telephone, and that classroom teaching in an open engine room is difficult.<ref name="Laughlin-12-167-168">Laughlin (2008), pp. 12-167–12-168.</ref> A small examination room near the entrance, for walk-up emergency cases and blood pressure screening, was described in 2008 as a recent addition.<ref name="AL-12-238" />
 
A burn building for [[live fire training]] is usually the first training structure provided at a fire training centre.<ref name="AL-12-247">Acomb and LeBoeuf (2008), p. 12-247.</ref> Design guidance named by Acomb and LeBoeuf (2008) includes NFPA 1402 and NFPA 1403.<ref name="AL-12-245">Acomb and LeBoeuf (2008), p. 12-245.</ref> Such centres can incorporate a working fire station.<ref name="AL-12-240" />


== Health, safety and structural resilience ==
== Health, safety and structural resilience ==
Acomb and LeBoeuf (2008) assume that any crew will at some time meet a contamination that requires complete removal of clothing. A station therefore needs a room or space for [[decontamination]], where personnel remove their outer clothing and clean their skin without contaminating the rest of the building.<ref name="AL-12-239" /> Foot-operated hampers, automatic showers and automatic doors let a contaminated person enter without touching anything. A direct exterior entrance keeps contamination out of other areas, and a toilet room should be placed next to it.<ref name="AL-12-239" />
Acomb and LeBoeuf (2008) assume that any crew will at some time meet a contamination that requires complete removal of clothing. A station therefore needs a room or space for [[decontamination]], where personnel remove their outer clothing and clean their skin without contaminating the rest of the building.<ref name="AL-12-239" /> Foot-operated hampers, automatic showers and automatic doors let a contaminated person enter without touching anything. A direct exterior entrance keeps contamination out of other areas, and a toilet room should be placed next to it.<ref name="AL-12-239" />


The medical supply room should be lockable and near the ambulances, with a locked cabinet for narcotics; a room of 3.1 m × 3.7 m (10 ft × 12 ft) generally serves.<ref name="AL-12-239-240">Acomb and LeBoeuf (2008), pp. 12-239–12-240.</ref> Few commercial laundries accept turnout gear, so a laundry with a commercial washer and dryer is placed near the gear storage.<ref name="AL-12-240" /> Loflin (2008) describes infection control under NFPA 1581 as including a separate room and laundry for cleaning protective clothing, a clean kitchen work area and properly spaced living quarters. The 1992 edition gave the initial requirements, the 1995 edition added facility safety, and the 2000 edition added cleaning of apparatus.<ref name="Loflin-12-115">Loflin (2008), p. 12-115.</ref> Even without in-house cleaning, he adds, the department is required to clean fire fighters' protective clothing at least every 6 months.<ref name="Loflin-12-115" />
The medical supply room should be lockable and near the ambulances, with a locked cabinet for narcotics; a room of 3.1 m × 3.7 m (10 ft × 12 ft) generally serves.<ref name="AL-12-239-240">Acomb and LeBoeuf (2008), pp. 12-239–12-240.</ref> Few commercial laundries accept turnout gear. Acomb and LeBoeuf (2008) recommend a laundry with a commercial washer and dryer and suggest placing it near the gear storage.<ref name="AL-12-240" /> Loflin (2008) describes infection control under NFPA 1581 as including a separate room and laundry for cleaning protective clothing, a clean kitchen work area and properly spaced living quarters. The 1992 edition gave the initial requirements, the 1995 edition added facility safety, and the 2000 edition added cleaning of apparatus.<ref name="Loflin-12-115">Loflin (2008), p. 12-115.</ref> Even without in-house cleaning, he adds, the department is required to clean fire fighters' protective clothing at least every 6 months.<ref name="Loflin-12-115" />


Acomb and LeBoeuf (2008) state that a fire station cannot withstand even the slightest failure of a structural component. It must resist snow, wind, rain and earthquake, with a stronger frame and extra bracing compared with similar buildings.<ref name="AL-12-236" /> All stations, whatever their size, should have a backup power supply.<ref name="AL-12-236" /> Manley (2008) explains that building codes treat hospitals and fire stations as essential facilities with increased minimum design loads, although the actual gain in performance cannot be quantified.<ref name="Manley-1-46">Manley (2008), p. 1-46.</ref> In the US model building codes summarised by Iqbal and Salley (2004), fire stations fall in the Business (B) use group.<ref name="IS-B-33">Iqbal and Salley (2004), p. B-33.</ref>
Acomb and LeBoeuf (2008) state that a fire station cannot withstand even the slightest failure of a structural component. It must resist snow, wind, rain and earthquake, with a stronger frame and extra bracing compared with similar buildings.<ref name="AL-12-236" /> All stations, whatever their size, should have a backup power supply.<ref name="AL-12-236" /> Manley (2008) explains that building codes treat hospitals and fire stations as essential facilities with increased minimum design loads, although the actual gain in performance cannot be quantified.<ref name="Manley-1-46">Manley (2008), p. 1-46.</ref> In the US model building codes summarised by Iqbal and Salley (2004), fire stations fall in the Business (B) use group.<ref name="IS-B-33">Iqbal and Salley (2004), p. B-33.</ref>

Revision as of 01:16, 8 November 2026

Fire station design is the planning, siting and layout of the building that houses a fire department's vehicles, equipment and crews and from which those crews respond to emergencies. In US practice as described by Acomb and LeBoeuf (2008), a station ranges from a single apparatus bay with a desk at the back to a multiple-company building with a full administrative function.[1] Because no single solution suits every community, they describe a process of needs assessment, planning, design and construction carried out with knowledgeable architects and engineers.[1]

The layout should bring crews to their vehicles quickly and provide for the cleaning of equipment and protective clothing. Stations staffed around the clock also need living and sleeping accommodation.[2][3][4] Other spaces described in the handbook include a watch room, kitchen, lounge and decontamination room or space. The handbook names safety, functionality, durability and ease of maintenance as the primary design issues.[5] The guidance summarised here describes the United States in the years before 2008. It is offered as ideas and rules of thumb rather than as an exhaustive set of requirements.[1]

Role of the fire station

Emergency services are usually delivered through a decentralised system of fire stations, strategically located throughout a community. Each station houses engine, ladder, rescue and other companies as local needs demand and resources permit.[6] The company, a group of personnel operating one or more pieces of apparatus under a company officer, is the basic tactical unit. Several companies may operate from one station, and in most cases at least one engine company is based at each station.[7] In larger departments, companies are organised into battalions or districts, as described under fire department organisation.[7] In 2005 the 30,500 local fire departments of the United States had 48,400 fire stations.[8]

For station-based companies, the station is the starting point of the apparatus response; some volunteers instead travel directly to the incident.[9] Johnson and Price (2008) divide the total reflex time after an alarm into dispatch time, turnout time, response (travel) time, access time and setup time.[10] Turnout time runs from the moment units acknowledge the alarm to the start of travel. It can be managed partly by improving communication between the dispatch centre and the station.[10]

NFPA 1710, as described by Johnson and Price (2008), sets a turnout time objective of one minute (60 s) for career departments.[11] For call and volunteer departments the turnout time is typically greater.[12] On an alarm, members of many volunteer departments report to an assigned station and respond from there with the apparatus.[9]

The International Fire Engineering Guidelines (IFEG) define dispatch time as the time from notification of the alarm until the fire service vehicles leave the station. A station with full-time paid fire fighters is likely to respond faster than one operated by volunteers.[13] The number and location of stations, the resources they contain and the time to dispatch those resources are among the principal factors governing fire service capability for firefighting.[14] This capability may change over the life of a building as station locations, budgets, equipment and traffic change.[13]

Denlinger (2008) describes the neighbourhood station as a possible key delivery point for fire prevention, with station crews delivering community programmes.[15] Lawson and Vettori (2005), studying the response to the World Trade Center attack of 2001, note that accountability in career departments typically begins at the station. Fire fighters on a shift are checked in by an officer, and a riding list of personnel and job assignments is prepared for each company.[16]

Planning and needs assessment

The design professional and the fire department need a clear shared understanding from the conceptual design phase onwards. Acomb and LeBoeuf (2008) add that the designer should not depend on the fire chief to know every element a station needs, particularly the architectural ones.[17] The first step is a needs assessment, completed before any land is bought. A building committee is a common way to gather the views of staff, end users, the community and joint users such as a police substation.[17]

The assessment documents existing conditions, determines the spaces needed now, and estimates future needs at least 20 years ahead. Many guidelines suggest 50 years, although the authors add that this may not be practical.[17] Data are best gathered room by room. Typical questions concern the present and future size of the staff and of the apparatus, public access, drive-through bays, gender issues, and where protective gear and hoses are cleaned, dried and stored.[17]

In some cases the budget alone has the greatest impact on the design, so it should be estimated early. The total project cost is the sum of the construction (hard) costs, which are the contractors' bids, and the soft costs.[18] Soft costs are often overlooked. They include land, surveys, environmental and hazardous material studies and abatement, soil borings, consultant, permit and utility fees, furniture and equipment, temporary facilities, dispatch connections and demolition.[19] In US local government, new stations are usually funded through a capital improvement budget separate from the fire department's own budget.[20]

Site selection

The site must be chosen before the structural system can be determined, and the choice depends on the department's response goals.[17] Acomb and LeBoeuf (2008) give an example: a goal of reaching any incident within 4 minutes leads to a different site than a 9-minute goal. The analysis should include a traffic study and, for volunteer stations, the time members need to reach the station. Site selection should anticipate growth rather than react to it, projecting 50 years ahead.[17] Where stations should stand within a response network is treated under fire station location.

Stations on major routes may seem efficient, but they remove expensive land from the tax base. An alternative is a site just off the major route, with a signalised intersection giving safe access to it.[17] This improves emergency egress and reduces vehicle accidents and traffic stacking. It was becoming more popular in 2008, helped by technology that lets apparatus control intersection signals.[18] Johnson and Price (2008) add that apparatus must enter the street safely and return without disrupting traffic, so a side street may be preferable. At volunteer stations, apparatus may be leaving while members are still arriving.[21]

Acomb and LeBoeuf (2008) list rules of thumb for the site. The exit curb cut should be at least 30.4 m (100 ft) from an intersection, and the apparatus apron at least 18.2 m (60 ft) long from the street right-of-way to the bay doors.[18] The apron should slope no more than 2 percent, and the road should be at least 7.315 m (24 ft) wide. Sites at the bottom of a hill, or behind barriers such as railway tracks, one-way streets and flood-prone bridges, should be avoided.[18] For parking, a rule of thumb is two spaces for each member on a shift, to cover the shift change, plus spaces for other staff and the public.[18]

A site also needs environmental, geotechnical and archaeological due diligence.[18] Many US state building codes define fire stations as essential facilities and require a soil investigation for the permit.[18] Johnson and Price (2008) add terrain and flood risk, which geographic information systems can map with soils, earthquake faults and slopes. The size of the building, the number of personnel and any training area dictate the size of the site.[21]

Choosing between candidate sites means balancing conflicting objectives, such as minimising cost, risk and travel distance. Donegan (2002) notes that such a problem never has a correct solution, but that a structured analysis gives insight into the quality of the decision.[22] In his simplified illustration, an architect rates five candidate station sites on six attributes from 0 (horrible) to 100 (best possible). The attributes are grouped as Site (bearing capacity, site dimensions, planning freedom) and Situation (spatial access, road infrastructure, area fire statistics).[23] Each attribute receives a weight, the weights sum to 1, and the aggregate benefit of a site is the weighted sum of its values:[24]

Bj=∑i=1nwivij,∑i=1nwi=1

Symbol Description Unit
Bj aggregate benefit of candidate site j points (0–100)
wi weight of attribute i – (fraction)
vij value given to site j on attribute i points (0–100)
n number of attributes –
Values and weights in Donegan's illustration[24]
Attribute Weight A B C D E
Road infrastructure 0.34 95 15 75 65 35
Spatial access 0.26 70 75 65 45 55
Bearing capacity 0.19 60 5 5 25 85
Site dimensions 0.10 45 25 5 50 95
Area statistics 0.08 25 95 5 25 55
Planning freedom 0.03 70 25 95 85 65
Aggregate benefit 70.5 36.4 47.1 48.1 58.2

As a worked example, site A scores 0.34 × 95 + 0.26 × 70 + 0.19 × 60 + 0.10 × 45 + 0.08 × 25 + 0.03 × 70. The terms are 32.3 + 18.2 + 11.4 + 4.5 + 2.0 + 2.1, giving 70.5 points, the highest of the five sites.[24] The three Situation attributes carry 68 percent of the weight, so Donegan tests how the ranking changes with that weight. Site E would rank first only if the Situation weight fell below 48.2 percent, which he judges unlikely, so site A can be recommended.[24] Acomb and LeBoeuf (2008) describe a similar weighted scorecard, with criteria scored from 1 to 10, for choosing the site of a fire training centre.[25]

Building layout and response efficiency

The designer and the fire department must develop the plan and the relationships between spaces together. One method is a spreadsheet in which staff rate each proposed room against the others for importance and travel distance.[2] For most stations the programmed spaces fall into four categories: apparatus and vehicle storage, administration, residential and living areas, and operations and support.[26]

The handbook identifies the time spent getting equipment out of the door as the key time for fire suppression and emergency medical work. The layout should therefore minimise the distance personnel travel to the vehicles.[2] Spaces that belong next to the apparatus floor include the sleeping area, medical supply rooms and storage for hose and spare breathing apparatus cylinders. Placing them there also shortens the trips needed to restock the apparatus.[2]

Design practice in 2008 was to build a single-storey station where the site allowed. Sliding poles were described as a rapidly diminishing tradition because of injuries, and a stairway was considered far safer.[2] In a two-storey station, administration can go upstairs while response functions, including sleeping, stay on the ground floor. One-storey stations are typically cheaper, mainly because two storeys require a lift and vertical circulation.[2] Injuries have occurred on both poles and stairs between sleeping area and bays, so the authors prefer the sleeping area on the same level as the bays, which also gives a faster response.[3]

Acomb and LeBoeuf (2008) describe US fire stations as public facilities subject to accessibility standards under the Americans with Disabilities Act. In their account, multistorey stations require lifts and local waivers are not recognised in court.[27] Sustainable design was gaining acceptance, formalised in the LEED (Leadership in Energy and Environmental Design) rating system.[26]

Apparatus bay

Fire trucks, rescue trucks, ambulances and other support vehicles are housed in the apparatus bay. Its floor must carry heavily loaded trucks standing day after day, and the trucks are as tall and wide as the law allows.[26] Acomb and LeBoeuf (2008) recommend doors of 4.26 m × 4.26 m (14 ft × 14 ft) and a bay width of at least 4.8 m (16 ft). The extra width allows maintenance in place, with room to open doors and tilt hoods.[26] At least 1.5 m (5 ft) should separate the bay doors from the front of the parked apparatus. The bay should be well lit and heated, with an exhaust venting system and floor drains under the trucks; drains need an oil/water separator to limit pollution.[26]

The bay must fit the fire apparatus the department expects to own, and the needs assessment asks about apparatus size now and in the future.[17] Tutterow (2008) notes that a mid-mount aerial ladder has a lower overall height when nested, which matters for older stations with low door openings.[28] He also calls it critical to keep apparatus batteries charged in the station, with an onboard charger or a polarised plug for an external charger.[29]

Tutterow (2008) states that diesel engines made up almost all engines in newly manufactured apparatus at the time, and that diesel exhaust is a carcinogen that must be removed from stations.[30] He lists three ways: source capture with a hose on the exhaust pipe, an air handling and filtration unit in the bay, and an on-board system.[31] Changing all the air in the bay whenever apparatus start or return is undesirable where the air is heated or cooled, because a large volume of new air must then be conditioned.[2] Kitchen and dining areas should be separated from the bay to prevent diesel contamination.[32] A second national needs assessment, published in 2006, estimated that 72 percent of US fire stations were not equipped for exhaust emission control.[33][34]

The watch room, also called the alarm room or station office, is the office of the apparatus floor. It ranges from a minimum of 11 m² (120 ft²) with a desk, telephone, map and radio to a room for six or more people.[3] It handles paperwork, the logging of calls and station-to-apparatus communication, and it usually overlooks the bays and apron.[3] Some departments keep a 24-hour watch at a console in each station to receive dispatch messages and control the alerting devices; others rely on the communications centre to operate them. Controls for lights, electrically operated doors and traffic-control devices are usually at the watch desk.[35]

Living, office and support spaces

In stations staffed at all times, the sleeping accommodation is traditionally a "bunk room" with bunk beds, and many newer stations use dormitory-style rooms.[3] A growing trend in 2008 was for volunteer services to have members staff the station on a "duty night". Acomb and LeBoeuf (2008) report that in many cases this can reduce response time by 4 minutes or more.[3]

Many older stations were designed for men only. The handbook describes three approaches to gender separation: separate facilities of equal size, separate facilities of different size, and gender-neutral facilities. The last, which includes individual bunk rooms, tends to be the most flexible and cost-effective.[2] The authors argue that a shared bunk room with half- or three-quarter-height walls gives privacy while supporting the team concept. Separate rooms for women can leave them feeling apart from the company and may double the sleeping space, because the number on duty varies.[3]

Where every person assigned to a station has clothing storage, this can mean three or four storage areas for each on-duty person.[3] The kitchen of a staffed station is in almost constant use, which calls for a cooking area of commercial quality. A station with two or three full companies and a chief can be called on to serve upwards of 60 meals a day.[32] A fitness room is sized from its equipment and clearances and needs a corridor at least 0.914 m (3 ft) wide for quick exit.[32]

Stations with an administrative role can need offices for the chief, the fire prevention officer, who reviews oversized plans, and training staff.[26] A separate training room should be set up as a classroom.[3] Laughlin (2008) notes that training in a working station suffers from distractions such as visitors and the station telephone, and that classroom teaching in an open engine room is difficult.[36] A small examination room near the entrance, for walk-up emergency cases and blood pressure screening, was described in 2008 as a recent addition.[3]

A burn building for live fire training is usually the first training structure provided at a fire training centre.[37] Design guidance named by Acomb and LeBoeuf (2008) includes NFPA 1402 and NFPA 1403.[38] Such centres can incorporate a working fire station.[4]

Health, safety and structural resilience

Acomb and LeBoeuf (2008) assume that any crew will at some time meet a contamination that requires complete removal of clothing. A station therefore needs a room or space for decontamination, where personnel remove their outer clothing and clean their skin without contaminating the rest of the building.[32] Foot-operated hampers, automatic showers and automatic doors let a contaminated person enter without touching anything. A direct exterior entrance keeps contamination out of other areas, and a toilet room should be placed next to it.[32]

The medical supply room should be lockable and near the ambulances, with a locked cabinet for narcotics; a room of 3.1 m × 3.7 m (10 ft × 12 ft) generally serves.[39] Few commercial laundries accept turnout gear. Acomb and LeBoeuf (2008) recommend a laundry with a commercial washer and dryer and suggest placing it near the gear storage.[4] Loflin (2008) describes infection control under NFPA 1581 as including a separate room and laundry for cleaning protective clothing, a clean kitchen work area and properly spaced living quarters. The 1992 edition gave the initial requirements, the 1995 edition added facility safety, and the 2000 edition added cleaning of apparatus.[40] Even without in-house cleaning, he adds, the department is required to clean fire fighters' protective clothing at least every 6 months.[40]

Acomb and LeBoeuf (2008) state that a fire station cannot withstand even the slightest failure of a structural component. It must resist snow, wind, rain and earthquake, with a stronger frame and extra bracing compared with similar buildings.[2] All stations, whatever their size, should have a backup power supply.[2] Manley (2008) explains that building codes treat hospitals and fire stations as essential facilities with increased minimum design loads, although the actual gain in performance cannot be quantified.[41] In the US model building codes summarised by Iqbal and Salley (2004), fire stations fall in the Business (B) use group.[42]

Construction materials are generally those of the region, judged on structural capacity, durability, maintenance, life-cycle cost and energy efficiency.[4] The 2006 needs assessment estimated that 36 percent of US fire stations were at least 40 years old and 54 percent had no backup power.[33][34] Among its resource categories was the modification of stations for reasons of fire fighter health and safety.[33]

Limits of the guidance

The handbook chapter offers ideas without an exhaustive list of possibilities. Its dimensions, such as 4.26 m doors or an 18.2 m apron, are presented as rules of thumb and recommendations.[1][18] The authors advise adapting the guidance to local conditions and regulations.[5] Several of the legal references, such as the Americans with Disabilities Act, the Clean Water Act and certification for the Environmental Protection Agency, are US federal rules.[18][27]

The numbers describe a particular period: the station count is for 2005, and the needs-assessment percentages come from a report published in 2006.[8][34] The weighted site score depends on weights and values that are judgements. Donegan (2002) calls sensitivity analysis an important but often overlooked part of the process, and his illustration leaves costs aside.[24]

See also

Notes

  1. ↑ 1.0 1.1 1.2 1.3 Acomb and LeBoeuf (2008), p. 12-233.
  2. ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 Acomb and LeBoeuf (2008), p. 12-236.
  3. ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 Acomb and LeBoeuf (2008), p. 12-238.
  4. ↑ 4.0 4.1 4.2 4.3 Acomb and LeBoeuf (2008), p. 12-240.
  5. ↑ 5.0 5.1 Acomb and LeBoeuf (2008), p. 12-251.
  6. ↑ Denlinger (2008), p. 12-51.
  7. ↑ 7.0 7.1 Denlinger (2008), p. 12-63.
  8. ↑ 8.0 8.1 Hall and Cote (2008), p. 3-27.
  9. ↑ 9.0 9.1 Denlinger (2008), p. 12-74.
  10. ↑ 10.0 10.1 Johnson and Price (2008), p. 12-218.
  11. ↑ Johnson and Price (2008), p. 12-220.
  12. ↑ Johnson and Price (2008), p. 12-222.
  13. ↑ 13.0 13.1 National Research Council of Canada et al. (2005), p. 1.9-2.
  14. ↑ National Research Council of Canada et al. (2005), p. 1.9-5.
  15. ↑ Denlinger (2008), p. 12-57.
  16. ↑ Lawson and Vettori (2005), p. 55.
  17. ↑ 17.0 17.1 17.2 17.3 17.4 17.5 17.6 17.7 Acomb and LeBoeuf (2008), p. 12-234.
  18. ↑ 18.0 18.1 18.2 18.3 18.4 18.5 18.6 18.7 18.8 Acomb and LeBoeuf (2008), p. 12-235.
  19. ↑ Acomb and LeBoeuf (2008), pp. 12-235–12-236.
  20. ↑ Denlinger (2008), p. 12-68.
  21. ↑ 21.0 21.1 Johnson and Price (2008), p. 12-228.
  22. ↑ Donegan (2002), p. 5-13.
  23. ↑ Donegan (2002), p. 5-14.
  24. ↑ 24.0 24.1 24.2 24.3 24.4 Donegan (2002), p. 5-15.
  25. ↑ Acomb and LeBoeuf (2008), p. 12-244.
  26. ↑ 26.0 26.1 26.2 26.3 26.4 26.5 Acomb and LeBoeuf (2008), p. 12-237.
  27. ↑ 27.0 27.1 Acomb and LeBoeuf (2008), pp. 12-236–12-237.
  28. ↑ Tutterow (2008), p. 12-276.
  29. ↑ Tutterow (2008), p. 12-273.
  30. ↑ Tutterow (2008), p. 12-269.
  31. ↑ Tutterow (2008), pp. 12-269–12-270.
  32. ↑ 32.0 32.1 32.2 32.3 32.4 Acomb and LeBoeuf (2008), p. 12-239.
  33. ↑ 33.0 33.1 33.2 Jenaway (2008), p. 12-42.
  34. ↑ 34.0 34.1 34.2 Jenaway (2008), p. 12-50.
  35. ↑ Denlinger (2008), p. 12-67.
  36. ↑ Laughlin (2008), pp. 12-167–12-168.
  37. ↑ Acomb and LeBoeuf (2008), p. 12-247.
  38. ↑ Acomb and LeBoeuf (2008), p. 12-245.
  39. ↑ Acomb and LeBoeuf (2008), pp. 12-239–12-240.
  40. ↑ 40.0 40.1 Loflin (2008), p. 12-115.
  41. ↑ Manley (2008), p. 1-46.
  42. ↑ Iqbal and Salley (2004), p. B-33.

References

  • Acomb, D. J., & LeBoeuf, R. M. (2008). Fire rescue stations and fire service training centers. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-233–12-251). National Fire Protection Association.
  • Denlinger, R. F. (2008). Managing fire-rescue departments. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-51–12-78). National Fire Protection Association.
  • Donegan, H. A. (2002). Decision analysis. In P. J. DiNenno, D. Drysdale, C. L. Beyler, W. D. Walton, R. L. P. Custer, J. R. Hall Jr., & J. M. Watts Jr. (Eds.), SFPE handbook of fire protection engineering (3rd ed., pp. 5-8–5-23). National Fire Protection Association; Society of Fire Protection Engineers.
  • Hall, J. R., Jr., & Cote, A. E. (2008). An overview of the fire problem and fire protection. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 3-3–3-30). National Fire Protection Association.
  • Iqbal, N., & Salley, M. H. (2004). Fire Dynamics Tools (FDTs): Quantitative fire hazard analysis methods for the U.S. Nuclear Regulatory Commission Fire Protection Inspection Program (NUREG-1805). U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation.
  • Jenaway, W. F. (2008). Needs assessment and hazard analysis. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-41–12-50). National Fire Protection Association.
  • Johnson, R., & Price, M. (2008). GIS for fire station locations and response protocols. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-215–12-231). National Fire Protection Association.
  • Laughlin, J. W. (2008). Training programs for fire and emergency service personnel. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-161–12-175). National Fire Protection Association.
  • Lawson, J. R., & Vettori, R. L. (2005). The emergency response operations (NIST NCSTAR 1-8). National Institute of Standards and Technology.
  • Loflin, M. E. (2008). Safety, medical, and health issues and programs. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-107–12-125). National Fire Protection Association.
  • Manley, B. E. (2008). Fundamentals of structurally safe building design. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 1-31–1-49). National Fire Protection Association.
  • National Research Council of Canada, International Code Council, Department of Building and Housing, & Australian Building Codes Board. (2005). International fire engineering guidelines (2005 ed.). Australian Building Codes Board.
  • Tutterow, R. (2008). Fire department apparatus and equipment. In A. E. Cote, C. C. Grant, J. R. Hall, Jr., & R. E. Solomon (Eds.), Fire protection handbook (20th ed., pp. 12-267–12-287). National Fire Protection Association.