Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity |
m Remove source references from file description |
||
| Line 1: | Line 1: | ||
== Summary == | == Summary == | ||
A branch can require successful action before a scenario-specific deadline | A branch can require successful action before a scenario-specific deadline. | ||
Original illustration for [[Event tree analysis]], level 3 Advanced. | Original illustration for [[Event tree analysis]], level 3 Advanced. | ||
* Alt text: Two timelines compare protective action before and after the same critical-condition deadline. | * Alt text: Two timelines compare protective action before and after the same critical-condition deadline. | ||
* Accuracy notes: Neither strip supplies a design response time. Avoid a universal sequence suggesting every protection system requires separate electronic detection. | * Accuracy notes: Neither strip supplies a design response time. Avoid a universal sequence suggesting every protection system requires separate electronic detection. | ||
Latest revision as of 08:54, 13 November 2026
Summary
A branch can require successful action before a scenario-specific deadline.
Original illustration for Event tree analysis, level 3 Advanced.
- Alt text: Two timelines compare protective action before and after the same critical-condition deadline.
- Accuracy notes: Neither strip supplies a design response time. Avoid a universal sequence suggesting every protection system requires separate electronic detection.
Licensing
New drawing by Fire Safety Academy. © Fire Safety Academy.
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 17:13, 2 November 2026 | 900 × 600 (8 KB) | Emma (talk | contribs) | Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity |
You cannot overwrite this file.
File usage
The following page uses this file: