Skip to content

File:Fse-time-equivalence-v3.svg: Difference between revisions

From Fire Safety Academy Wiki
Jan (talk | contribs)
Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity
 
Peter (talk | contribs)
Align the figure description with the corrected values and source in the article.
 
(2 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Summary ==
== Summary ==
Equivalent time for the office in the worked example (800 MJ/m², w<sub>f</sub> = 1.40) with different conversion factors and modification factors. Based on Ministry of Business, Innovation and Employment (2025b), pp. 22–25, and Australian Building Codes Board (2020a), Data Sheet B3, p. 37.
Equivalent time for the reinforced-concrete office in the worked example (800 MJ/m², w<sub>f</sub> ≈ 1.40), with different conversion and modification factors. The structural material factor is 1, including k<sub>c</sub> = 1 for the Eurocode calculation.


Original illustration for [[Time equivalence]], level 4 Expert.
Original illustration for [[Time equivalence]], level 4 Expert.


* Source basis: Ministry of Business, Innovation and Employment (2025b), p. 22 (800 MJ/m²), p. 23 (F_m 0.5, 1.0, 1.25), pp. 24–25 (Equations 2.1, 2.2; k_b 0.065); Australian Building Codes Board (2020a), Data Sheet B3, p. 37 (k_b 0.055 and 0.07); Van Rossum (2027), §5.5 (concrete properties, b about 2,012)
* Alt text: Bar chart for a reinforced-concrete office with material factor 1: equivalent times of 36, 62, 73, 78 and 91 minutes for different conversion and modification factors.
* Alt text: Bar chart of equivalent time for one office: 36, 62, 73, 78 and 91 minutes for different factors.


== Licensing ==
== Licensing ==
New drawing by Fire Safety Academy. © Fire Safety Academy.
New drawing by Fire Safety Academy. © Fire Safety Academy.

Latest revision as of 18:24, 23 November 2026

Summary

Equivalent time for the reinforced-concrete office in the worked example (800 MJ/m², wf ≈ 1.40), with different conversion and modification factors. The structural material factor is 1, including kc = 1 for the Eurocode calculation.

Original illustration for Time equivalence, level 4 Expert.

  • Alt text: Bar chart for a reinforced-concrete office with material factor 1: equivalent times of 36, 62, 73, 78 and 91 minutes for different conversion and modification factors.

Licensing

New drawing by Fire Safety Academy. © Fire Safety Academy.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current18:24, 23 November 2026Thumbnail for version as of 18:24, 23 November 2026900 × 600 (9 KB)Peter (talk | contribs)Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity
17:27, 2 November 2026Thumbnail for version as of 17:27, 2 November 2026900 × 600 (9 KB)Jan (talk | contribs)Watermark: Fire Safety Academy logo icon, 70 px, 45 % opacity

The following page uses this file:

Metadata